
Best Hospital Architects in Pakistan: How to Choose the Right Firm
By Tanveer Ahmed, CEO, Ahmed Construction Company (ACCO) · Updated · Reviewed by ACCO architects and engineers
Quick Answer
How to choose the best hospital architects in Pakistan: what they do, specialist vs general firms, questions to ask, design process and warning signs. Ahmed Construction Company (ACCO), based in Gulberg-III Lahore since 1998, provides hospital design & construction services with design drawings free on award of construction.
Finding the best hospital architects in Pakistan is one of the most important decisions a hospital owner makes. The architect sets the layout, patient flow, departmental relationships and space for services that the hospital will live with for decades. Good hospital architecture in Pakistan saves money in construction and operation, helps the facility pass licensing, and makes care safer. This guide explains what hospital architects actually do, what separates a specialist from a general architect, how to compare firms, and the questions to ask before you appoint one.
Hospital Architects in Pakistan at a Glance
| What they deliver | Functional brief, master plan, departmental layouts, architectural drawings, coordination with structural and MEP engineers, approval drawings |
|---|---|
| Key skills | Clinical planning, patient flow, infection control, coordination of HVAC, medical gases, fire safety and equipment |
| Registration | Architects in Pakistan register with the Pakistan Council of Architects and Town Planners; engineers with the Pakistan Engineering Council |
| Standards | Building Code of Pakistan, NFPA life safety, ASHRAE 170 healthcare ventilation, provincial healthcare commission standards |
| Engagement models | Design only, design with supervision, or design and build through a turnkey hospital contractor |
What Does a Hospital Architect Do?
A hospital architect turns a clinical idea into a building that works. The work usually covers:
- Functional brief: agreeing the services, bed numbers, theatres, ICU beds, diagnostic equipment and staffing with the owner and doctors.
- Master planning: placing the building on the site, separating entrances, parking and service yards, and reserving space for future expansion.
- Departmental planning: arranging OPD, emergency, imaging, theatres, ICU, wards, laboratory and support services so that the right departments sit next to each other.
- Room design: sizing every room for its equipment, staff and patients, with the right services at each location.
- Coordination: working with structural, HVAC, electrical, plumbing, medical gas and fire engineers so that the design is buildable.
- Approvals: preparing drawings for the local authority and checking the layout against healthcare licensing standards.
Specialist vs General Architect
Many competent architects design houses, plazas and offices well but have limited hospital experience. Hospitals need specialist knowledge that is hard to learn on a single project.
| Area | General architect | Specialist hospital architect |
|---|---|---|
| Patient flow | One main entrance and lobby | Separate routes for patients, staff, emergency, supplies and waste |
| Operation theatres | Treated as normal rooms | Planned with clean corridors, scrub, recovery, CSSD links and pressure zones |
| Services | Left largely to engineers | Shafts, ceiling voids and plant rooms planned from the first layout |
| Licensing | Checked late, if at all | Built into the brief and room sizes |
| Expansion | Rarely considered | Future wings, floors and plant capacity reserved |
What Good Hospital Architecture in Pakistan Looks Like
Clear zoning
Public, clinical, inpatient and service zones are separated so that visitors do not wander into theatres and waste never passes through waiting areas. Read our guide to patient flow in hospital design for the principles.
Design for the local climate
Pakistan’s summers make shading, insulation and efficient cooling essential. A design that copies a European or Gulf hospital without adapting to local heat, dust and power supply will be expensive to run.
Services that fit
HVAC ducts, medical gas pipes, cable trays and drainage need space. Good architects allow deep enough ceiling voids, vertical shafts in the right places and plant rooms of the right size.
Infection control by design
Hand-wash points, isolation rooms, clean and dirty utility rooms and cleanable finishes are planned, not added later.
Seismic and fire safety
Hospitals are essential facilities. Structural layout, fire compartments and protected escape routes are part of the architectural concept from day one.
Types of Hospitals and the Expertise Each Needs
Hospital architecture is not one discipline. Each type of facility has its own planning priorities, and the best firm for one may not be the best for another. When you shortlist hospital architects, check their experience against the type you are building.
- General and multi-specialty hospitals: the widest range of departments and the most complex adjacencies between emergency, imaging, theatres and ICU.
- Mother and child hospitals: labour suites, obstetric theatres, NICU and paediatric wards, with strong emphasis on privacy and family space. See our guide to paediatric, general and specialty hospital design.
- Surgical and day-care centres: theatre suites, pre-operative and recovery areas, and fast patient turnover.
- Specialist hospitals: eye, ENT, cardiac, kidney and cancer centres, each with particular equipment, shielding or water treatment needs.
- Teaching hospitals: additional space for students, lecture rooms, skills labs and on-call accommodation.
- Rehabilitation and long-stay facilities: therapy gyms, accessibility throughout and a more residential character.
A firm that has delivered several facilities of your type will ask better questions at the briefing stage and avoid mistakes that only show up once the hospital is operating.
How to Compare Hospital Architecture Firms
Relevant projects
Ask to see completed hospitals or clinics similar in size to yours, and visit at least one if possible.
Team
Check who will actually work on your project, and whether structural and MEP engineers are in-house or coordinated partners.
Process
Ask how they develop the brief with doctors, how many design reviews are included, and how changes are handled.
Buildability
Ask whether they produce a BOQ and how they stay involved during construction.
Questions to Ask Before Appointing an Architect
- How many hospitals or clinics has your team designed, and which are operating now?
- How do you work with the doctors and nurses who will use the building?
- Who designs the HVAC, medical gas, electrical and fire systems, and how are they coordinated?
- How do you check the design against the healthcare commission’s standards?
- Will you prepare a detailed BOQ so the project can be priced accurately?
- What is included in your fee, and what are the stages and deliverables?
- Will you supervise construction or only provide drawings?
For a broader checklist that also covers contractors, see how to choose the best hospital construction company in Pakistan.
Design-Only vs Design and Build
Owners in Pakistan usually choose between two routes. In the design-only route, the owner appoints an architect, then tenders the drawings to contractors. This gives independent design control but puts the owner in charge of coordinating between designer and builder. In the design-and-build route, one firm takes responsibility for design and construction. This reduces gaps between drawings and site work and gives a single point of accountability, which suits owners who do not have an in-house project team or who are overseas.
Either way, the quality of the hospital depends on the brief and the coordination of services. Our guide to why hospital design matters before construction starts explains how early decisions affect cost and time.
The Hospital Design Process
Brief and feasibility
Services, beds, site, budget and phasing are agreed and tested.
Concept and master plan
Site layout, zoning, massing and departmental relationships.
Detailed design
Room layouts, equipment, structure and MEP coordinated in drawings and models.
Approvals and BOQ
Authority drawings, licensing review and an itemised bill of quantities.
Construction support
Site supervision, shop drawing review and commissioning.
Warning Signs When Choosing an Architect
- A very low fee with drawings promised in days, before the brief is agreed
- No hospital projects to show, or only renderings without completed buildings
- No clear plan for MEP design and coordination
- Reluctance to involve doctors in design reviews
- No mention of licensing standards or fire safety
How ACCO Approaches Hospital Architecture
Ahmed Construction Company (ACCO) has worked in design and construction from Lahore since 1998. For hospitals, ACCO provides feasibility, architectural design, structural and MEP coordination, approvals support and construction as one service. Design drawings are free when ACCO is awarded the construction, and every project is priced through an itemised BOQ. Details of the full service are on our hospital construction page.
Frequently Asked Questions
How do I find the best hospital architects in Pakistan?
Look for firms with completed, operating hospitals similar to your project, a coordinated engineering team, a clear process for working with doctors, and experience with healthcare licensing standards.
Do hospital architects in Pakistan need to be registered?
Yes. Architects should be registered with the Pakistan Council of Architects and Town Planners, and engineers with the Pakistan Engineering Council.
Should the architect also design the MEP systems?
The architect should lead coordination, while qualified engineers design HVAC, electrical, plumbing, medical gas and fire systems. What matters most is that they work together from the start.
How long does hospital design take?
It depends on the size and complexity of the hospital and how quickly the brief is agreed. A small clinic can be designed in weeks, while a large hospital takes several months.
Is design and build better than hiring a separate architect?
Design and build gives one point of responsibility and fewer gaps between drawings and site work. A separate architect gives independent design control. The right choice depends on the owner’s in-house capacity.
How are hospital design fees worked out?
Fees depend on scope, size and stages included. With ACCO, design drawings are free when ACCO is awarded construction, and the project is priced through an itemised BOQ.
Conclusion
The best hospital architects in Pakistan are those who understand clinical work as well as buildings. Choose a team with real hospital experience, coordinated engineering, a structured design process and a clear link to construction, and the result will be a hospital that is easier to build, license and run.
Related articles
Contact ACCO
- +92 322 8000190
- info@acco.com.pk
- Office 2, 3rd Floor, Bigcity Plaza, Gulberg-III, Lahore
Planning a Project with ACCO?
Architecture, engineering and construction from one Lahore team since 1998. Design drawings are free when ACCO is awarded the construction.
Discuss Your ProjectWhatsApp +92 322 8000190