Ahmed Construction Company
Pakistan Construction Cost Estimator 2026

Get Your Free Cost Estimate

Enter your details below to access Pakistan's most detailed construction cost estimator — residential & commercial, all regions.

⚠️ Please fill in all fields correctly.
Skip for now →
🔒 Your information is safe. We will contact you only regarding your construction enquiry.
info@acco.com.pk  |  +92 322 800 0190

Thank You!

Your enquiry has been received. Our team at Ahmed Construction Company will contact you shortly at the number you provided.

You can now access the full construction cost estimator.

ACCO — Ahmed Construction Company
Ahmed Construction Company
Pakistan's Trusted Construction Partner

Pakistan Construction
Cost Estimator

Residential & Commercial Plaza — All Regions — Gray & Full Finish

2026 RATES • PKR • ALL PROVINCES
5 ProvincesCovered
3 GradesEconomy→Luxury
Free ToolNo signup needed
📍 Select Your Region:
Lahore / Punjab rates — Jan 2026

Quick Size Presets Click to auto-fill per-floor covered area

Construction Details Enter Your Requirements

Enter covered area in Square Feet per floor
Gray / SFT
Finishing / SFT
Combined / SFT
Total SFT
Estimated Total
Add Basement?Extra cost calculated per SFT of basement area
Usually equal to or less than plot area

Construction Cost Estimate

2026 RATES

Material Specifications 2026 Market Rates — Brand-wise

📋 Detailed Cost Breakdown — Item by Item incl. rate/SFT column
Work Item / Material Specification & Brand Qty / Area Rate/SFT Total Cost (PKR)
⚠️ Disclaimer: Estimates based on 2026 rates in selected region (Pakistan). Rates include material + labour. Regional multipliers applied automatically. Not included: land cost, architect fees (2–5%), utility connections, external development charges. Always get 2–3 contractor quotations. Rates: January 2026.ACCO | www.acco.com.pk | +92 322 800 0190
📍 Select Region:
Lahore / Punjab commercial rates
Commercial Plaza Construction — 2026 Rates (PKR) | ACCO — www.acco.com.pk
Covers 4 Marla, 5 Marla, 8 Marla, 10 Marla & 20 Marla commercial plots with basement. Each card shows: covered area per floor, total floors, gray structure cost, full finishing cost & grand total. Commercial rates are 30–40% higher than residential due to heavier RCC, pile foundation, fire systems, commercial MEP, and lifts.

Commercial Plaza Reference Costs Gray + Full Finish + Basement — 2026 Standard Grade

Typical Floor Usage Recommended floor allocation — commercial plaza

Basement
Parking / Storage
2–3 cars per Marla, waterproofed RCC + Sika
Ground Floor (G)
Shops / Showroom
Prime commercial units, max visibility
1st Floor
Shops / Offices
Secondary retail or professional offices
2nd Floor
Offices / Clinics
Corporate offices, medical / dental clinics
3rd–5th Floors
Apartments / Offices
Mixed-use: studio flats or office suites
Top Floor / Roof
Penthouse / Services
Lift room, water tanks, staircase head

Custom Commercial Plaza Calculator Enter Your Plot Size & Requirements

Total plot area in Square Feet
Usually 75–85% of plot area
Include Basement?Adds Rs. 4,200–5,500 per SFT (parking/habitable)

Commercial Plaza Cost Estimate

2026 RATES
📋 Commercial Plaza — Full Detailed Breakdown Item-by-item with SFT rates
Work Item Specification & Brand Qty / Area Rate/SFT Total Cost (PKR)
Additional Commercial Costs (NOT Included Above):
Lift / Elevator (Chinese brand): Rs. 25–35 Lac per lift  |  European brand: Rs. 50–80 Lac
Generator (50–150 KVA): Rs. 12–30 Lac  |  ATS Panel: Rs. 1.5–3 Lac
Fire Fighting System (sprinklers + pump): Rs. 180–280/SFT
CCTV + Security System: Rs. 60–150/SFT
Architect + Structural Engineer fees: 3–5% of total cost
NOC / Approval Charges: Rs. 2–10 Lac (varies by city/society)
WAPDA / SNGPL Connection: Rs. 1.5–4 Lac extra
Pile Foundation surcharge (G+5 and above): +15–25% on gray structure
⚠️ Commercial Disclaimer: Commercial construction costs are 30–40% higher than residential due to structural load, fire safety, commercial-grade MEP, and heavier RCC. Rates for selected region, 2026. High-rise (G+5+) requires structural engineering and pile foundation. Always engage a licensed structural engineer. — ACCO | www.acco.com.pk | +92 322 800 0190
2026 Pakistan Construction Material Rates — Complete Reference | ACCO — www.acco.com.pk
Medium, Luxury & Ultra-Luxury specification as of January 2026 (Punjab / Lahore base rates). All rates include supply and labour unless stated otherwise. Regional multipliers: Sindh +5–8%, KPK –5–8%, Balochistan +8–15%, AJK +3–6%, GB +10–18%.
📊 Material & Labour Rate Card — 2026 (PKR)
Material / Item Medium Grade Luxury Grade Ultra-Luxury Unit
▪ STRUCTURAL MATERIALS
Cement DG Khan / Maple Leaf
Rs.1,550/bag | Rs.14/SFT
DG Khan / Fauji OPC
Rs.1,650/bag | Rs.18/SFT
Fauji / Lucky Premium
Rs.1,800/bag | Rs.24/SFT
50 kg bag
Bricks Engineering / Solid
Rs.34,000/1000 | Rs.100/SFT
Facing / Khaprail
Rs.48,000/1000 | Rs.140/SFT
Hand-made Khaprail
Rs.65,000/1000 | Rs.180/SFT
Per 1,000 bricks
Steel Rebar Grade 60 (60K PSI)
Rs.360/kg | Rs.320/SFT
TMT Grade 75 / Ittefaq
Rs.400/kg | Rs.420/SFT
BS4449 / Kamran Steel
Rs.450/kg | Rs.550/SFT
Per kg
River Sand Lawrencepur / Ravi
Rs.100/CFT
Lawrencepur Washed
Rs.120/CFT
Swat Washed Fine
Rs.160/CFT
Per CFT
Aggregate / Crush 1" High Grade
Rs.130/CFT | Rs.16/SFT
Margalla 3/4" Washed
Rs.160/CFT | Rs.22/SFT
Attock 3/4" Premium
Rs.200/CFT | Rs.30/SFT
Per CFT
Roof Slab (RCC) RCC 6" + Heat Proof
Rs.480/SFT
RCC 7" + Insulation
Rs.700/SFT
RCC 8" + Roof Tiles + Insulation
Rs.950/SFT
Per SFT incl. labour
▪ FINISHING MATERIALS
Flooring Imported Marble / Good Tiles
Rs.650/SFT
Italian Marble / Oak Wood
Rs.2,500/SFT
Calacatta / Herringbone Oak
Rs.5,500/SFT
Supply + fix
Wall Tiles Master / RAK Ceramic
Rs.420/SFT
Porcelain / Spanish Tiles
Rs.1,200/SFT
Large Format Italian Porcelain
Rs.3,000/SFT
Kitchen / bathrooms
Paint ICI Weathershield / Silk
Rs.130/SFT
Dulux / Mapa Premium
Rs.220/SFT
Dulux Velvet Touch / 3D Texture
Rs.400/SFT
2 coats + primer
Doors Solid Wood / PVC Panel
Rs.42,000/door
Teak / Sheesham / Steel Clad
Rs.90,000/door
Imported Solid Oak / Custom Steel
Rs.180,000/door
Frame + shutter + hdwr
Windows UPVC Double Glazed
Rs.1,100/SFT
German UPVC Triple Glass
Rs.2,200/SFT
Schüco / Reynaers Aluminium
Rs.4,500/SFT
Supply + install
▪ MEP (Mechanical, Electrical, Plumbing)
Electrical Wiring Concealed + DB Panel
Rs.280/SFT
Smart Wiring + Automation
Rs.550/SFT
Full KNX / BMS Smart Home
Rs.1,200/SFT
Full wiring + fixtures
Plumbing PPR / CPVC Full System
Rs.220/SFT
Grohe / Kohler System
Rs.420/SFT
Hansgrohe / Toto Full System
Rs.900/SFT
Supply + drainage + fixtures
Waterproofing Kryton + Membrane
Rs.160/SFT
Sika / Fosroc Full System
Rs.280/SFT
Mapei / Tremco Premium
Rs.450/SFT
Roof + baths + basement
▪ OVERALL RATE PER SFT — RESIDENTIAL
Gray Structure / SFTRs. 3,800Rs. 5,000Rs. 7,000Per SFT (residential)
Full Finishing / SFTRs. 2,000Rs. 3,500Rs. 6,500Per SFT additional
Total (Gray+Finish) / SFTRs. 5,800Rs. 8,500Rs. 13,500Combined per SFT
Basement Basic / SFTRs. 3,500Rs. 4,800Rs. 6,500Storage / parking
Basement Habitable / SFTRs. 4,500Rs. 6,500Rs. 9,000Full room spec
▪ OVERALL RATE PER SFT — COMMERCIAL
Commercial Gray / SFTRs. 4,800Rs. 6,200Rs. 8,500Per SFT (commercial)
Commercial Finish / SFTRs. 3,200Rs. 4,500Rs. 7,000Per SFT additional
Commercial Total / SFTRs. 8,000Rs. 10,700Rs. 15,500Combined per SFT
Commercial Basement / SFTRs. 4,200Rs. 5,500Rs. 7,500Parking / habitable
⚠️ Note: All rates are for Lahore / Punjab region, January 2026 (base rates). Labour is included unless stated. Commercial rates include heavier structural requirements. Ultra-Luxury rates reflect premium imported finishes and European MEP systems. For accurate quotes contact: ACCO | www.acco.com.pk | +92 322 800 0190