Hospital Construction in Pakistan: 2026-27 Planning & Cost Guide

Hospital Construction in Pakistan: 2026-27 Planning & Cost Guide

Hospital Construction in Pakistan: 2026-27 Planning & Cost Guide

By , CEO, Ahmed Construction Company (ACCO) · Updated · Reviewed by ACCO architects and engineers

Since 1998Design and construction in Lahore
Based in Gulberg-IIIHead office in Lahore
Architects + EngineersArchitecture, structure and MEP in-house
Free DrawingsOn award of construction

Quick Answer

Plan your hospital construction in Pakistan with 2026-27 cost benchmarks and expert guidance from ACCO. Get a free consultation today. Ahmed Construction Company (ACCO), based in Gulberg-III Lahore since 1998, provides hospital design & construction services with design drawings free on award of construction.

A hospital is the most technically demanding building most owners will ever commission. Clinical flows, infection control, medical gases, specialised HVAC, fire safety and regulatory licensing all have to work together from the first day of operation. Mistakes made at design stage are expensive to correct once patients are inside. This guide explains how hospital construction in Pakistan is planned for 2026-27, the main cost drivers, the systems involved and the steps from feasibility to commissioning.

Hospital Construction at a Glance

Starts withA functional brief: services, bed count, departments, patient volumes and growth
RegulationBuilding approval from the local authority and licensing by the provincial healthcare commission, such as the Punjab Healthcare Commission
Key systemsHVAC with pressure control, medical gas pipelines, power with backup, fire safety, water and waste management
Reference standardsWHO guidance, ASHRAE for healthcare ventilation, NFPA for fire and life safety, HTM 02-01 for medical gases
PricingItemised BOQ covering civil, MEP and specialist systems separately

Planning Starts With the Functional Brief

Before any drawing, the owner and design team should agree what the hospital will do: which specialties, how many beds, operation theatres and ICU beds, outpatient volumes, diagnostics and support services, and how the facility may grow. This brief drives every decision that follows, from the size of the plot needed to the capacity of the power and HVAC systems. A feasibility study then tests the brief against budget, site and regulations.

Clinical Planning and Zoning

Separate flows

Patients, visitors, staff, clean supplies and waste should follow separate routes wherever possible.

Adjacencies

Emergency close to imaging and theatres; ICU close to theatres; labs and pharmacy easy to reach.

Infection control

Isolation rooms, clean and dirty utility rooms, easy-to-clean finishes and controlled air movement.

Read more on ICU and emergency design and operation theatre standards.

Engineering Systems

  • HVAC: filtered air, controlled air changes and pressure relationships for theatres, ICUs and isolation rooms.
  • Medical gases: oxygen, vacuum and medical air pipelines with alarms and zone valves. See our medical gas pipeline guide.
  • Electrical: dual supply where possible, generators, UPS for critical areas and isolated power in theatres.
  • Fire safety: compartmentation, detection, sprinklers or hydrants and safe evacuation of patients who cannot walk.
  • Water and waste: safe water storage, hot water, drainage, and segregation and handling of healthcare waste.

See hospital MEP systems for more detail.

What Drives Hospital Construction Cost

ItemEffect on budget
Critical areasTheatres, ICUs and imaging rooms cost far more per square foot than wards or OPD
HVAC and MEPOften a very large share of the total building cost in hospitals
Medical gasesPipelines, manifolds and outlets scale with bed and theatre numbers
Special constructionRadiation shielding, modular OT panels and seamless flooring
Medical equipmentUsually budgeted separately from building works

A detailed BOQ and feasibility study set the real budget. See hospital BOQ and feasibility services.

From Feasibility to Commissioning

Brief and feasibility

Services, capacity, site, budget and regulations.

Design

Clinical planning, architecture, structure and MEP coordinated together.

Construction

Civil works, MEP installation and specialist systems with inspections.

Commissioning

Testing and balancing of systems, documentation and licensing support.

Frequently Asked Questions

How long does it take to build a hospital in Pakistan?

A small hospital may take around 18 to 24 months from design to commissioning; larger facilities take longer depending on size, phasing and approvals.

Which approvals are needed?

Building plan approval from the local authority and registration and licensing by the provincial healthcare commission, plus environmental and other permits where applicable.

Is medical equipment included in construction cost?

Usually not. Equipment is budgeted separately, but its requirements for space, power, shielding and services must be designed into the building.

Has ACCO built hospitals?

Yes. ACCO’s hospital work includes LDMC, MCH Islamkot, and projects at King Edward Medical University/Mayo Hospital and UOL Hospital Lahore.

Conclusion

Hospital construction succeeds when clinical planning, engineering systems and regulations are resolved together before building starts, and when the budget is based on a detailed BOQ. ACCO provides hospital design and construction in Pakistan from feasibility through commissioning.

Contact ACCO

Planning a Project with ACCO?

Architecture, engineering and construction from one Lahore team since 1998. Design drawings are free when ACCO is awarded the construction.

Discuss Your ProjectWhatsApp +92 322 8000190

Tanveer Ahmed is the CEO of Ahmed Construction Company (ACCO), a Lahore-based architecture, engineering and construction firm operating since 1998. He has led ACCO since 2005, delivering hospital projects such as LDMC, MCH Islamkot and work at King Edward Medical University / Mayo Hospital and UOL Hospital Lahore, along with residential construction in DHA and Bahria Town, commercial buildings, MEP systems and turnkey projects across Pakistan.