Diagnostic & Imaging Departments: Layout, Equipment & Trends (2026-27)

Diagnostic & Imaging Departments: Layout, Equipment & Trends (2026-27)

Diagnostic & Imaging Departments: Layout, Equipment & Trends (2026-27)

By , CEO, Ahmed Construction Company (ACCO) · Updated · Reviewed by ACCO architects and engineers

Since 1998Design and construction in Lahore
Based in Gulberg-IIIHead office in Lahore
Architects + EngineersArchitecture, structure and MEP in-house
Free DrawingsOn award of construction

Quick Answer

Diagnostic & imaging departments in Pakistan: layout zones, X-ray, CT and MRI room planning, radiation shielding, MEP services and 2026-27 design trends. Ahmed Construction Company (ACCO), based in Gulberg-III Lahore since 1998, provides hospital design & construction services with design drawings free on award of construction.

Diagnostic & imaging departments are among the most technical parts of any hospital in Pakistan. They house heavy, sensitive equipment, they use ionising radiation and strong magnetic fields, and they serve inpatients, outpatients and emergency cases at the same time. A department that is planned well keeps patients safe, lets radiologists report quickly and leaves room for new machines. One that is planned badly creates queues, safety risks and expensive rework when equipment is replaced. This guide explains how to lay out diagnostic and imaging areas, what each modality needs from the building, and the trends shaping new departments in 2026-27.

Diagnostic & Imaging Departments at a Glance

Typical modalitiesDigital X-ray, ultrasound and Doppler, mammography, fluoroscopy, CT, MRI, and in larger hospitals nuclear medicine and interventional radiology
Key regulatorsPakistan Nuclear Regulatory Authority (PNRA) for radiation facilities; Punjab Healthcare Commission or the provincial equivalent for licensing the healthcare establishment
Design referencesBuilding Code of Pakistan (PEC), equipment supplier site-planning guides, ASHRAE healthcare ventilation guidance and NFPA life-safety principles
Critical building itemsRadiation shielding, MRI RF shielding and magnetic safety zones, floor loading, vibration control, dedicated power and precision cooling
PricingItemised BOQ per project; see the hospital construction cost guide for Pakistan

Why Imaging Needs Early Planning

Most building elements can be adjusted late in design. Imaging rooms cannot. The position of an MRI scanner affects the structure below it, the route used to bring the magnet into the building, the location of the quench pipe and the size of the plant room. A CT room needs shielding in its walls, floor and sometimes ceiling, which must be calculated before the walls are built. If these decisions are left until after the frame is complete, owners often have to break slabs, rebuild walls or accept a poor layout.

The best approach is to choose the likely equipment, or at least the class of equipment, during concept design. Suppliers publish site-planning requirements that set room dimensions, weights, heat loads and electrical demand. ACCO coordinates these requirements with architecture, structure and MEP as part of its hospital design and construction services.

Zoning the Department

A clear zoning plan is the foundation of a good imaging department. It separates the public from technical areas and keeps patient, staff and equipment routes simple.

Public zone

  • Reception, registration and billing
  • Waiting areas, with a separate area for inpatients on trolleys where possible
  • Toilets, including accessible toilets

Semi-restricted zone

  • Patient change cubicles and secure lockers
  • Ultrasound, general X-ray and mammography rooms
  • Preparation and recovery bays for contrast studies

Restricted zone

  • CT and MRI scan rooms with their control rooms
  • Equipment and technical rooms
  • Reporting rooms, PACS workstations and staff areas

Placing the department on the ground floor, close to the emergency department and with a direct link to inpatient lifts, shortens the most frequent journeys. Our guide to how a hospital works from OPD to ICU explains how imaging fits into the wider clinical flow.

Planning Each Modality

X-ray and fluoroscopy

Compact rooms with shielded walls and doors, a protected control area with a lead-glass viewing window, and space for trolley access. Fluoroscopy rooms also need an adjoining patient toilet.

Ultrasound

No radiation shielding, but privacy, dimmable lighting, a hand-wash basin and good acoustic separation. Rooms are often grouped so sonographers can share support space.

Mammography

A small shielded room with a private change area next to it. Calm interiors matter because many patients are anxious.

CT scanner

A larger shielded room, a control room with a clear view of the patient, a preparation bay for contrast and an emergency route for unstable patients.

MRI suite

An RF-shielded scan room, a technical room, a control room and controlled safety zones that keep ferromagnetic objects away from the magnet.

Nuclear medicine

Hot lab, injection room, uptake rooms and shielded waste storage, all subject to regulatory approval before use.

Room sizes depend on the equipment chosen, and the supplier’s site-planning drawing should always be the final reference. As a general guide, general X-ray rooms are compact, CT rooms are noticeably larger, and an MRI suite with its control and technical rooms takes the most area. Shielding design is covered in more depth in our article on diagnostic imaging centre architecture and shielding.

Radiation and MRI Safety in the Building

Radiation shielding

Rooms with X-ray, fluoroscopy, CT or nuclear medicine equipment need shielding that is calculated, not assumed. A qualified medical physicist works out the required protection from the equipment workload and the use of adjoining spaces, including rooms above and below. The result may be lead sheet, lead-lined board, dense concrete or a combination. Doors, viewing windows, service penetrations and joints all need the same level of protection. PNRA licensing requirements apply to these facilities, so documentation should be prepared alongside the design.

MRI safety zones

MRI does not use ionising radiation, but its magnetic field is always on. The suite is therefore planned in progressive zones, from a public area through screening and control to the scan room itself. Access is controlled so that only screened people and MRI-safe equipment enter. The scan room is enclosed in an RF shield, usually copper or similar, with filtered service penetrations and a waveguide for gases or cables. The quench pipe must have a safe, direct route to the outside.

Structural considerations

  • Floor loading for heavy magnets and CT gantries
  • Low vibration, away from lifts, plant and traffic
  • Distance from large moving steel objects that can disturb image quality
  • A removable wall panel or clear route for future equipment replacement

MEP Services for Imaging

Imaging equipment is sensitive to power quality and temperature. The engineering services must be designed around it.

  • Electrical: dedicated feeders, correctly rated breakers, UPS support for critical systems and standby generator coverage.
  • Cooling: precision cooling for MRI and CT technical rooms, with stable temperature and humidity and redundancy for critical units.
  • Chilled water: many MRI systems need chilled water for the compressor; the supply must be reliable all year.
  • IT: high-capacity data links for PACS and RIS, with secure network rooms nearby.
  • Fire safety: detection and suppression chosen to suit sensitive equipment, coordinated with the fire strategy in line with NFPA principles.

Small Centre vs Hospital Department

FactorStand-alone diagnostic centreHospital imaging department
PatientsMainly walk-in outpatientsOutpatients, inpatients and emergency cases
LocationGround floor with street accessNear emergency, with inpatient lift access
ModalitiesOften X-ray, ultrasound and one CT or MRIFull range, sometimes with interventional suites
Operating hoursExtended dayUsually 24 hours for CT and X-ray
ExpansionLimited by plot sizeShould reserve space for future scanners

How an Imaging Project Runs

Brief and equipment list

Services, expected patient numbers and preferred equipment are defined. A hospital feasibility study helps test demand.

Design coordination

Supplier site plans are coordinated with architecture, structure and MEP.

Shielding and approvals

Physicist calculations, regulatory documents and an itemised BOQ are prepared.

Build, install and test

Rooms are built, shielding is checked, equipment is installed and commissioned.

  • AI-assisted reporting: software that helps prioritise urgent studies, which increases the need for good IT infrastructure.
  • Cloud and remote PACS: teleradiology lets specialists report from other cities, useful for smaller hospitals.
  • Patient-friendly interiors: ambient lighting, natural materials and clear wayfinding reduce anxiety.
  • Energy efficiency: better insulation and efficient chillers reduce the high cooling load of imaging departments.
  • Flexible rooms: generous technical space and removable panels make future equipment changes easier.

Common Mistakes to Avoid

  • Finalising the building before choosing the class of equipment
  • Placing MRI next to lifts, car parks or heavy plant
  • Leaving service penetrations through shielded walls unprotected
  • No route for replacing a scanner in ten years’ time
  • Mixing inpatient trolleys and outpatient waiting in the same space

Frequently Asked Questions

Where should the imaging department be located in a hospital?

Usually on the ground floor, close to the emergency department and with direct access to inpatient lifts. This shortens the most frequent patient journeys and simplifies delivery of heavy equipment.

Who approves radiation facilities in Pakistan?

Facilities using X-ray, CT or nuclear medicine fall under the Pakistan Nuclear Regulatory Authority, while the healthcare establishment itself is licensed by the provincial healthcare commission. Requirements should be checked early in design.

How thick should shielding be in an X-ray or CT room?

There is no single figure. A medical physicist calculates the shielding from the equipment, workload and the use of surrounding rooms. Using a standard thickness without a calculation can leave a room under-protected or over-built.

Does an MRI room need lead shielding?

No. MRI does not use ionising radiation. It needs RF shielding, controlled magnetic safety zones, a quench pipe and stable cooling instead.

Can an existing building be converted into a diagnostic centre?

Often yes, but the structure must be checked for floor loading and vibration, and there must be space for shielding, plant and an equipment delivery route. A structural survey should come before any lease or purchase.

How is the cost of an imaging department estimated?

ACCO prices civil works, shielding, MEP and interiors through an itemised BOQ based on the equipment chosen. Equipment itself is normally purchased separately from suppliers.

Conclusion

Diagnostic and imaging departments succeed when equipment, structure, shielding and services are planned together from the start. Clear zoning, early supplier coordination and room for future change give hospitals a department that is safe, efficient and ready for new technology. ACCO supports owners from feasibility to commissioning through its design and construction services.

Contact ACCO

Planning a Project with ACCO?

Architecture, engineering and construction from one Lahore team since 1998. Design drawings are free when ACCO is awarded the construction.

Discuss Your ProjectWhatsApp +92 322 8000190

Tanveer Ahmed is the CEO of Ahmed Construction Company (ACCO), a Lahore-based architecture, engineering and construction firm operating since 1998. He has led ACCO since 2005, delivering hospital projects such as LDMC, MCH Islamkot and work at King Edward Medical University / Mayo Hospital and UOL Hospital Lahore, along with residential construction in DHA and Bahria Town, commercial buildings, MEP systems and turnkey projects across Pakistan.