
How to Plan Interior Design for New Apartment Buildings in Pakistan
By Tanveer Ahmed, CEO, Ahmed Construction Company (ACCO) · Updated · Reviewed by ACCO architects and engineers
Quick Answer
How to plan interior design for new apartment buildings in Pakistan: layouts, services, materials, approvals, BOQ budgeting and handover, step by step. Ahmed Construction Company (ACCO), based in Gulberg-III Lahore since 1998, provides interior design services with design drawings free on award of construction.
Interior design in an apartment building is usually treated as the last job on site, after the structure, services and façade are finished. That is the most expensive way to do it. When you plan interior design for new apartment buildings in Pakistan from the start, wardrobes fit the walls, ceilings hide the ducts without lowering rooms too much, kitchens get proper exhaust, and every unit is finished to a consistent standard. This guide explains how developers, investors and first owners in Lahore, Karachi and Islamabad can plan apartment interiors step by step, what decisions need to be made early, and how to keep cost and quality under control.
Apartment Interior Planning at a Glance
| Best time to start | During architectural layout design, before structural drawings are frozen |
|---|---|
| Who is involved | Architect, interior designer, structural engineer, MEP engineer, contractor and (for developers) the sales team |
| Key decisions | Unit layouts, ceiling heights, kitchen and bathroom positions, AC and exhaust routes, finish levels per unit type |
| Approvals | Building plan approval from the relevant authority such as LDA or a cantonment board; fire safety under the Building Code of Pakistan |
| Pricing | Itemised BOQ per finish level; see ACCO’s apartment building construction page |
Why Early Interior Planning Matters in Apartment Projects
An apartment building repeats the same unit many times. A small planning mistake, such as a wardrobe that does not fit or a split AC with no drain route, is repeated in every unit and becomes expensive to correct. Early planning prevents that.
- Less rework. Chasing walls for new wiring or breaking tiles to move a drain wastes time and money.
- Better ceiling heights. Ducts, beams and false ceilings are coordinated so rooms do not feel low.
- Consistent quality. Every unit of the same type gets the same layout, fittings and finishes.
- Clearer sales. Buyers can see exactly what they are getting, which reduces disputes at handover.
- Higher value. Well-planned interiors generally rent and resell more easily than bare or poorly finished units.
Step 1: Define the Market and Finish Level
Start by deciding who the apartments are for. The interior plan for a rental block for young professionals is different from a luxury tower for families or a serviced apartment building.
Questions to answer first
- Will units be sold as shell, semi-finished or fully finished?
- Are they for owner-occupiers, renters or short-stay guests?
- Which unit types are planned: studio, one, two or three bedrooms, penthouses?
- Will buyers be allowed to choose from finish packages?
Many developers offer two or three finish levels, for example a standard and a premium package, each with a fixed specification. This keeps procurement simple while giving buyers some choice.
Step 2: Plan Layouts with the Architect
The interior designer should sit with the architect while unit layouts are drawn. Good apartment layouts in Pakistan usually follow a few principles:
- Living and dining areas face the best view and natural light.
- Bedrooms are away from lift lobbies and busy roads to reduce noise.
- Kitchens and bathrooms are stacked vertically from floor to floor so drains and shafts run straight.
- Each room has a wall long enough for a wardrobe, bed or sofa without blocking windows or doors.
- Balconies are usable, not just decorative, and have space for drying clothes or an AC outdoor unit.
For larger schemes, ACCO’s architecture and construction services coordinate the layout, structure and interiors as one package.
Step 3: Coordinate Services Before Construction
Most interior problems in apartments are really services problems. Agree these items before the slab drawings are finalised:
Air conditioning
Positions of indoor and outdoor units, drain routes, and sleeves through beams or walls. For central or VRF systems, duct routes and ceiling depth.
Electrical
Socket and switch positions matched to furniture layouts, lighting circuits, a dedicated circuit for the kitchen, and provision for solar or backup power.
Plumbing and gas
Fixed positions for sinks, WCs and geysers, access panels for shafts, and gas or electric cooking provision as permitted by the building’s safety design.
Exhaust and ventilation
Kitchen hood exhaust and bathroom fans connected to shafts or external walls, so smoke and moisture do not stay inside the unit.
Fire safety items such as smoke detectors, sprinkler heads (where required) and fire-rated main doors also need to be shown on the interior drawings so they are not covered by false ceilings or joinery.
Step 4: Plan Each Zone of the Apartment
Living and dining
Decide whether the kitchen is open or closed. Open kitchens make small units feel bigger but need stronger exhaust, especially for Pakistani cooking. A semi-open kitchen with a glass partition is a common compromise. Plan a TV or media wall with concealed conduits.
Kitchen
Choose a straight, L-shaped, U-shaped or parallel layout according to the room shape. Keep the sink, cooking range and refrigerator within a short working triangle. Use heat- and stain-resistant counters, moisture-resistant cabinet boards and enough sockets for appliances.
Bedrooms
Built-in wardrobes save floor space and look neat. Plan bedside sockets, a reading light and a position for the AC that does not blow directly on the bed. Use heavier curtains or double-glazed windows on noisy sides.
Bathrooms
Use anti-slip floor tiles, a proper fall to the floor drain, and a waterproofing membrane under tiles. Wall-hung WCs and vanities make cleaning easier. Provide an access panel for the concealed cistern and valves.
Lighting and colour
Use layered lighting: general ceiling light, task lighting in the kitchen and study, and accent lighting for features. LED fittings reduce running cost. Light, neutral colours make compact rooms feel larger and let buyers add their own style.
Step 5: Choose Materials and Finishes
Materials should be chosen for durability and maintenance as much as appearance, because the building will be used by many different families over many years.
| Element | Standard package | Premium package |
|---|---|---|
| Flooring | Porcelain or ceramic tiles | Large-format porcelain, engineered wood or stone in living areas |
| Walls | Emulsion paint | Paint with feature walls in panelling, stone or wallpaper |
| Ceilings | Painted slab with limited bulkheads | Gypsum false ceiling with cove and recessed lighting |
| Kitchen | Laminate cabinets, granite or tiled counter | Lacquer or acrylic cabinets, quartz counter, built-in appliances |
| Bathrooms | Floor-mounted fixtures, standard fittings | Wall-hung fixtures, concealed cisterns, glass shower enclosures |
| Windows | Aluminium or uPVC single glazing | uPVC or thermally broken aluminium with double glazing |
Whichever level you choose, fix a sample board for each unit type and approve it before procurement. This avoids colour and quality variations between batches.
Step 6: Budget Through an Itemised BOQ
Interior costs vary widely with the finish level, brands and size of the units, so a single rate per square foot is rarely reliable. ACCO prices apartment interiors through an itemised bill of quantities (BOQ) that lists every item, quantity and specification. This lets the developer compare packages, control changes and track spending against budget.
Practical budgeting tips:
- Keep a contingency for design changes and market price movements.
- Buy repeat items such as doors, sanitary ware and light fittings in bulk for the whole building.
- Lock buyer upgrade options before the relevant work starts on site.
For finishing-cost reference points, see ACCO’s guide to 1 kanal finishing in DHA Lahore, which explains how finish choices affect cost.
How an Apartment Interior Project Runs
Brief
Target market, unit mix and finish levels are agreed.
Design
Layouts, ceiling plans, electrical and plumbing layouts and joinery drawings for each unit type.
Mock-up unit
One sample apartment is finished first to test details and show buyers.
Roll-out
Floors are finished in sequence, with snagging and handover unit by unit.
The mock-up unit is one of the most useful steps. Problems found in one apartment are cheap to fix; the same problems found after fifty apartments are not.
Common Mistakes to Avoid
- Leaving interior design until the structure is complete
- No fixed position for AC outdoor units, leading to cluttered façades
- Weak kitchen exhaust in open-plan layouts
- Skipping waterproofing in bathrooms and balconies
- Allowing unlimited buyer changes late in construction
- No access panels for shafts, valves and cisterns
Frequently Asked Questions
When should interior design start in a new apartment building?
Ideally during architectural layout design, before structural and MEP drawings are frozen. This allows services, ceilings and joinery to be coordinated with the structure.
Should developers sell apartments finished or as shell units?
It depends on the market. Finished units are easier for buyers and renters, while shell or semi-finished units suit buyers who want to choose their own interiors. Many projects offer both, with fixed finish packages.
Is an open kitchen suitable for Pakistani apartments?
It can be, if the exhaust system is designed for heavy cooking. Many owners prefer a semi-open kitchen with a glass partition to control smoke and smell.
How is the cost of apartment interiors calculated?
ACCO prepares an itemised BOQ based on the approved drawings and finish specification for each unit type, so the cost reflects the actual materials and quantities rather than a rough rate.
Why build a mock-up apartment first?
A mock-up lets the team check details, fix problems and approve finishes before repeating them across the building, and it gives buyers a real example to inspect.
Does ACCO handle both construction and interiors?
Yes. ACCO provides architecture, structure, MEP and interior design and execution, so the apartment building and its interiors are planned and delivered together.
Conclusion
Good apartment interiors are planned, not added. By fixing the market and finish level early, coordinating services with the layout, testing details in a mock-up unit and pricing through an itemised BOQ, developers and owners get apartments that look better, work better and hold their value. ACCO, based in Gulberg-III Lahore since 1998, can help you plan and deliver apartment interiors from the first layout to final handover.
Related articles
ACCO services
Contact ACCO
- +92 322 8000190
- info@acco.com.pk
- Office 2, 3rd Floor, Bigcity Plaza, Gulberg-III, Lahore
Planning a Project with ACCO?
Architecture, engineering and construction from one Lahore team since 1998. Design drawings are free when ACCO is awarded the construction.
Discuss Your ProjectWhatsApp +92 322 8000190