Material of your choice
Home Building Grey Structure Complete within 4 Months
Grey Structure Checklist Items
- Marking on the plot for the foundation
- Digging for the foundation as per drawings foundation specification
- Termite proofing in the foundation
- P.C.C ( Plain Concrete Cement ) with gravel as per drawings term
- Foundation Brick Work Till DPC
- Seepage Treatment on the foundation
- Super Structure Completion with brickwork till Lentil
- Ground Floor and Frist Floor with Front and back Boundary wall
- Door Frames included ( GI ) Steel
- R.C.C Slab Lentil included withdrawing steel structure
- same as above on the First Floor Super Structure brickwork
- Elevation making as per 3D front View
- all-electric piping work underground
- all plumbing sewerage work as required
- plasterwork inside and outside of the building and house including boundary wall
- boundary wall included no extra charges for the external work
- Metal Safety grills included
- All Tanks included water sewerage
- Metal gate installation