
DHA Building Material Cost Guide (2025)
🧱 DHA Building Material Cost Guide (2025)
Latest Construction Material Prices in DHA Lahore | By ACCO Construction
🏗️ Why Material Cost Matters in DHA Construction
Building your dream home in DHA Lahore involves more than just selecting a design — it’s about budgeting smartly and understanding the material costs involved in the grey structure and finishing phases.
This 2025 guide breaks down the latest material rates used in DHA construction projects so you can make informed decisions, avoid overspending, and ensure quality construction from the ground up.
📊 Building Material Cost Overview – 2025
Material | Unit | Average Rate (PKR) | Usage |
---|---|---|---|
Bricks (Class A) | 1,000 bricks | 18,000 – 22,000 | Walls, partitions |
Crush (Margalla) | Cubic Foot | 135 – 145 | Foundation, RCC slabs |
Sand (Chenab/Ravi) | Cubic Foot | 45 – 70 | Plastering, mortar, filling |
Cement (Bestway, DG) | Per Bag (50kg) | 1,150 – 1,250 | Concrete, mortar, plaster |
Steel (60 Grade) | Per Ton | 255,000 – 270,000 | Beams, columns, slabs |
Gravel (Sargodha) | Cubic Foot | 125 – 135 | Floor beds, foundations |
Waterproofing Membrane | Roll | 6,000 – 7,000 | Basement, roof protection |
Bitumen | Per kg | 150 – 170 | Waterproofing |
PVC Pipes (Master/Popular) | Per ft | 60 – 100 | Plumbing systems |
Wiring (GM/Newage) | Per roll | 5,000 – 8,000 | Electrical cabling |
🎨 Finishing Material Cost (Optional Ranges)
Material | Unit | Rate Range (PKR) | Purpose |
---|---|---|---|
Floor Tiles (Porcelain) | Per sq. ft | 250 – 500 | Flooring |
Sanitary (Master/Faisal) | Per set | 150,000 – 350,000 | Bathrooms, kitchens |
Paint (ICI/Nippon) | Per gallon | 2,500 – 5,000 | Interior & exterior walls |
Aluminum Windows | Per sq. ft | 1,000 – 1,800 | Exterior windows |
Wood Doors (Ash, Deodar) | Per door | 25,000 – 80,000 | Main & internal doors |
Kitchen Cabinets (UV/High Gloss) | Per sq. ft | 2,500 – 4,000 | Modular kitchen fittings |
Wardrobes (Laminate/UV) | Per sq. ft | 2,200 – 3,800 | Bedroom storage |
False Ceiling (Gypsum) | Per sq. ft | 110 – 200 | Decorative ceilings |
📈 What Affects Material Costs in DHA?
-
📍 Project Location (Phases 5–9 differ in accessibility & material delivery)
-
🚛 Market Fluctuations (Cement, steel prices vary monthly)
-
🧱 Brand Selection (Premium vs. economy options)
-
🧰 Contractor Sourcing (Bulk purchase discounts with ACCO Construction)
🧮 Cost Planning Tips for Homeowners
-
Plan a detailed BOQ (Bill of Quantities)
-
Allocate 55–60% of the total cost to grey structure materials
-
Compare multiple vendor quotations for bulk purchases
-
Hire a turnkey contractor like ACCO to manage materials & labor efficiently
🔍 Why ACCO Construction?
✅ Transparent cost estimates
✅ Long-standing relationships with suppliers
✅ In-house procurement for price control
✅ Complete project management from grey to finishing
📞 Get Updated Material Estimates
Looking to build your house in DHA Phase 6, 7, or 8? We provide real-time market insights and full construction quotations based on your design and your plot size.
📍 Office: Big City Plaza, Gulberg-III, Lahore
🌐 Website: www.acco.com.pk
📧 Email: info@acco.com.pk
📱 WhatsApp: 0322-8000190
🔗 Related Guides:
Would you like this article turned into a PDF for sharing with clients or adding as a downloadable link on your website?
DHA Building Material Cost Guide (2025) |