DHA Finishing Cost Breakdown: What Finishing Includes and How It Is Priced
By Tanveer Ahmed, CEO, Ahmed Construction Company (ACCO) · Updated · Reviewed by ACCO architects and engineers
Quick Answer
DHA finishing cost breakdown for Lahore homes: flooring, paint, ceilings, woodwork, kitchens, bathrooms, electrical and exterior work, priced through a BOQ. Ahmed Construction Company (ACCO), based in Gulberg-III Lahore since 1998, provides house construction in Lahore with design drawings free on award of construction.
The finishing stage turns a grey structure into a home you can live in, and in DHA Lahore it is often the stage where budgets are most likely to drift. Floors, paint, ceilings, woodwork, kitchens, bathrooms, lighting and the front elevation all involve choices between many grades and brands, and each choice changes the final figure. This DHA finishing cost breakdown explains what finishing work includes, how each part is specified and priced, which decisions have the biggest effect on cost, and how to keep the finishing budget under control from the first selection to handover.
DHA House Finishing at a Glance
| What finishing covers | Flooring, plaster and paint, false ceilings, doors and woodwork, windows, kitchens, bathrooms, electrical fixtures, plumbing fixtures and exterior elevation |
|---|---|
| Biggest cost drivers | Finish grade, covered area, number of bathrooms, kitchen and wardrobe scope, imported versus local products |
| Finish levels | Standard, premium and luxury, defined item by item in the specification |
| Approvals | Elevation and building works in line with plans approved by DHA Lahore |
| Services references | Electrical and plumbing work to the approved design; ventilation guidance from ASHRAE where mechanical systems are included |
| Pricing | ACCO prices finishing through an itemised BOQ; see the DHA house construction cost guide for dated rates |
What the Finishing Stage Includes
Finishing begins once the grey structure is complete, with walls plastered or ready for plaster, slabs cast, and electrical conduits and plumbing pipes embedded. From that point every visible surface and every fixture you use is part of finishing. Because so many trades work in sequence, the order of work matters as much as the materials: services must be tested before ceilings close, and floors must be protected while painters and carpenters are still on site.
If your house is still at the structural stage, the grey structure cost guide explains what should be complete before finishing starts.
Finishing Work Item by Item
1. Flooring and tiling
Porcelain and ceramic tiles, marble, granite and engineered or laminated wood are the main options. Large-format tiles and natural stone need flatter screeds and more skilled fixing, which adds labour as well as material cost. Wet areas need slip-resistant tiles and proper falls to drains.
2. Plaster, putty and paint
Internal walls are usually finished with putty and emulsion; exterior walls with weather-resistant paint or textured coatings. The quality of surface preparation decides how long paint lasts, so the number of coats and the primer should be written into the specification.
3. False ceilings
Gypsum board ceilings hide services and allow cove lighting. Their cost depends on the area covered, the design complexity and whether access panels are needed for AC units and junction boxes.
4. Doors, woodwork and wardrobes
Main and internal doors, frames, wardrobes, vanities and media walls can be one of the largest finishing items. Solid hardwood, engineered wood and board products differ greatly in cost and in resistance to Lahore’s heat and humidity.
5. Kitchens
Cabinet material, worktop (granite, quartz or other), hardware and built-in appliances drive the cost. Appliances are often priced separately so that owners can choose brands.
6. Bathrooms
Each bathroom needs tiles, WC, basin, mixers, shower, accessories and waterproofing. The number of bathrooms is one of the biggest multipliers in the finishing budget.
7. Electrical fixtures and lighting
Wiring, distribution boards, switches, sockets and light fittings. Smart controls, CCTV and solar provisions are usually separate items. See smart home designs in DHA for options.
8. Exterior and elevation
Elevation cladding, boundary walls, gates, driveway, landscaping and external lighting complete the house and must follow DHA rules on projections and heights.
Standard, Premium and Luxury Finishing Compared
| Element | Standard | Premium | Luxury |
|---|---|---|---|
| Flooring | Local porcelain tiles | Large-format porcelain, local marble | Imported marble or stone, engineered wood |
| Walls | Putty and emulsion | Premium washable paint, feature walls | Textured finishes, panelling, cladding |
| Ceilings | Limited false ceilings | Gypsum ceilings in main rooms | Designed ceilings with integrated lighting |
| Woodwork | Board doors and wardrobes | Engineered doors, laminated or UV wardrobes | Solid hardwood and bespoke joinery |
| Sanitary | Local brands | Upper-range local or mid-range imported | Premium imported fittings |
These levels are only labels. What matters is the item-by-item specification in the BOQ, so that two quotations can be compared fairly.
How Finishing Is Priced
Finalise drawings
Architectural, interior, electrical and plumbing layouts show every surface and fixture.
Select materials
Brands, sizes and grades are chosen for each room, ideally with samples.
Measure and price
Areas and counts are taken off the drawings and priced in an itemised BOQ.
Control changes
Any change during construction is priced and approved before it is ordered.
ACCO uses this process on its DHA projects. The approach to rates is explained in how DHA construction rates are worked out.
Ways to Control Finishing Cost Without Losing Quality
Decide early
Fix selections before finishing starts, so long-lead items arrive on time and rush purchases are avoided.
Spend where it is used
Put premium materials in kitchens, main bathrooms and living areas, and use durable standard finishes elsewhere.
Keep layouts simple
Fewer complex ceilings, curved walls and custom joinery reduce labour as well as material.
Use local where suitable
Many local products perform well; reserve imported items for where they add real value.
How House Size and Layout Affect Finishing Cost
Finishing cost does not rise in a straight line with plot size. A 5 Marla house and a 1 Kanal house both need a kitchen, a main entrance, a staircase and several bathrooms, so smaller houses often carry a higher finishing cost per square foot because these fixed items are spread over less area. Larger houses, on the other hand, tend to have higher ceilings, more glazing, larger lounges and more elaborate elevations, which increase quantities quickly.
Layout matters as much as size. The main factors are:
- Number of bathrooms: each one adds tiles, waterproofing, sanitary ware, fittings and plumbing.
- Basement: basements need extra waterproofing, ventilation, lighting and often a separate finish specification.
- Double-height spaces: they need taller scaffolding, more wall finish and larger windows.
- Staircase: stone or wood treads, railings and lighting can be a significant single item.
- Elevation design: cladding, louvres, glass railings and external lighting vary widely in cost.
For layout ideas by plot size, see the DHA house design and front elevation page.
Room-by-Room Selection Checklist
Before finishing starts, prepare a selection schedule that lists, for every room, the floor finish, skirting, wall finish, ceiling type, lighting, switches and sockets, doors and any built-in furniture. For kitchens and bathrooms add worktops, cabinets, sanitary ware, mixers and accessories. A completed schedule lets the contractor price accurately, order on time and avoid the costly delays that come from decisions made on site.
Finishing Sequence and Quality Checks
A good finishing sequence avoids damage and rework. A typical order is: conduit and pipe testing, plaster and screed, ceiling framing, first coat of paint, flooring, woodwork installation, kitchen and bathroom fixtures, final paint, light fittings and snagging. At each step, quality checks should cover:
- Floor levels, tile joints and hollow-sounding tiles
- Wall flatness and paint coverage under raking light
- Door alignment, hardware operation and finish
- Pressure testing of water lines and leak checks in bathrooms
- Electrical testing of circuits, earthing and breakers
Common Finishing Mistakes in DHA Homes
- Starting finishing without complete interior and electrical drawings
- Accepting a rate per square foot without a written specification
- Changing tiles or fittings after ordering
- Skipping waterproofing in bathrooms, kitchens and terraces
- Under-budgeting woodwork, kitchens and exterior works
Finishing for Overseas Owners
Many DHA houses are built for families living abroad. For them, finishing is the hardest stage to manage remotely, because it involves dozens of visual choices. The most reliable approach is to agree a full selection schedule and BOQ before work starts, approve samples through photos and video calls, and receive regular progress reports with photographs of each room. Any change requested later should be priced in writing before it is ordered, so the owner always knows the effect on the budget and the programme.
Frequently Asked Questions
What is the finishing cost of a house in DHA Lahore?
It depends on covered area, finish level, number of bathrooms, woodwork scope and product choices. ACCO prices finishing through an itemised BOQ; dated indicative rates are published in the DHA cost guide.
What is included in house finishing?
Flooring, plaster and paint, false ceilings, doors and woodwork, windows, kitchens, bathrooms, electrical and plumbing fixtures, and exterior elevation work.
Is finishing more expensive than the grey structure?
In many DHA homes finishing costs as much as or more than the grey structure, especially at premium and luxury levels. The BOQ shows the actual split for your design.
How long does finishing take?
It depends on house size, finish level and how quickly selections are made. Delays in choosing materials are one of the most common causes of extended finishing periods.
Can I supply some finishing items myself?
Yes, items such as appliances, light fittings or sanitary ware can be owner-supplied if this is written into the contract, with clear responsibility for delivery and installation.
Does ACCO offer finishing only, without grey structure?
Yes. ACCO can survey an existing grey structure, list any remedial work and price finishing separately through a BOQ.
Conclusion
Understanding the DHA finishing cost breakdown helps homeowners make deliberate choices instead of reacting to surprises. When every room is specified, every item is priced in a BOQ and changes are controlled, finishing becomes predictable. For a complete design-to-handover service, see ACCO’s house construction services in Lahore.
Related articles
Contact ACCO
- +92 322 8000190
- info@acco.com.pk
- Office 2, 3rd Floor, Bigcity Plaza, Gulberg-III, Lahore
Planning a Project with ACCO?
Architecture, engineering and construction from one Lahore team since 1998. Design drawings are free when ACCO is awarded the construction.
Discuss Your ProjectWhatsApp +92 322 8000190