How Much Does It Cost to Build a Hospital in Pakistan? (2026 Cost Per Bed)

Concept render of a modern multi-storey hospital building with glass facade and rooftop greenery

How Much Does It Cost to Build a Hospital in Pakistan? (2026 Cost Per Bed)

By , CEO, Ahmed Construction Company (ACCO) · Updated · Reviewed by ACCO architects and engineers

Since 1998Design and construction in Lahore
Based in Gulberg-IIIHead office in Lahore
Architects + EngineersArchitecture, structure and MEP in-house
Free DrawingsOn award of construction

Quick Answer

How much it costs to build a hospital or clinic in Pakistan in 2026: cost per bed, by facility size, where the money goes, and what changes the budget. Ahmed Construction Company (ACCO), based in Gulberg-III Lahore since 1998, provides hospital design & construction services with design drawings free on award of construction.

Building a hospital in Pakistan in 2026 typically costs about PKR 4.5 to 12 million per bed for construction, finishing and MEP, excluding land and medical equipment. A mid-level 50-bed private hospital therefore needs roughly PKR 300 to 400 million for the building, and a 100-bed hospital about PKR 600 to 800 million. ICU-heavy and specialist hospitals cost more. Small clinics are usually budgeted per square foot instead of per bed. This guide breaks down the cost by facility size, explains where the money goes, and lists the decisions that change the budget most.

Concept render of a curved white hospital facade with glass entrance and planted terraces
Concept render for illustration only.

Indicative planning estimates as of October 2026. Hospital costs vary widely with specialty mix, city, MEP specification and imported equipment, so every project needs its own feasibility study and BOQ.

Hospital Construction Cost Per Bed (2026)

Hospital typeBuilding cost per bed (PKR)Typical features
Basic rural or secondary hospital4.5 – 6 millionGeneral wards, OPD, basic OT, simple ventilation
Mid-level private hospital6 – 8 millionPrivate rooms, 2 to 4 OTs, central medical gas, split or VRF HVAC
High-end or tertiary hospital8 – 12 millionModular OTs, ICU and CCU, imaging suites, central HVAC with HEPA zones
ICU or critical-care block10 – 15 millionIsolation rooms, pressure control, high power and gas redundancy

Estimated Cost by Facility Size

FacilityTypical covered areaEstimated building cost (excl. land and equipment)
Clinic or day-care centre2,000 – 4,000 sq ftAbout PKR 6,000 – 9,000 per sq ft fully finished
25-bed hospital15,000 – 22,000 sq ftAbout PKR 150 – 200 million
50-bed hospital25,000 – 40,000 sq ftAbout PKR 300 – 400 million
100-bed hospital60,000 – 80,000 sq ftAbout PKR 600 – 800 million
200+ bed specialist hospital120,000 sq ft and abovePKR 1.6 billion and above

Bed-based figures use the mid-level range of PKR 6 to 8 million per bed. A rural facility can come in lower, and a hospital with several ICUs, a cath lab or radiotherapy bunkers will be higher.

Where the Money Goes

Structure (35 – 45%)

Foundations, RCC frame, slabs designed for heavy equipment, shafts for lifts and services, and seismic detailing.

MEP systems (25 – 35%)

HVAC with infection-control zoning, medical gas pipelines, fire detection and suppression, standby generators, UPS and nurse call.

Finishes (20 – 25%)

Seamless vinyl or epoxy floors, washable wall systems, hygienic ceilings, lead lining for imaging rooms.

Specialised areas such as operation theatres, ICUs and radiology can add 15 to 30 percent to the cost of the zones where they sit. Medical equipment is normally budgeted separately unless the project is let as a full turnkey contract including equipment.

Factors That Change Hospital Construction Cost

  1. Specialty mix: a maternity or general hospital costs far less per bed than a cardiac or oncology centre.
  2. Number of OTs and ICU beds: each modular OT and ICU bed carries heavy HVAC, gas and power requirements.
  3. HVAC strategy: split units, VRF, or a central chilled-water plant with air-handling units and HEPA filtration.
  4. Regulatory standards: Punjab Healthcare Commission minimum service delivery standards, fire safety and, for some projects, international guidelines such as FGI or JCI.
  5. Site and structure: basements, poor soil, height and seismic zone.
  6. New build or conversion: converting an existing building can save on structure but often costs more in MEP and compliance work.
  7. Delivery method: design-build turnkey contracts reduce coordination gaps between architects, MEP designers and contractors.

Planning Steps Before You Build

Feasibility

Define services, bed count, catchment and a realistic budget including equipment and working capital.

Functional brief

Room-by-room schedule, patient and staff flows, clean and dirty routes.

Design and approvals

Architecture, structure and MEP coordinated together; local authority and healthcare commission requirements checked early.

Construction and commissioning

Phased build, testing of medical gas, HVAC pressure regimes and fire systems before handover.

Our guide on planning and building a modern hospital in Lahore covers these stages in more detail.

ACCO’s Hospital Construction Experience

Ahmed Construction Company (ACCO) plans, designs and builds healthcare facilities across Pakistan. Our hospital work includes LDMC, MCH Islamkot, and projects at King Edward Medical University / Mayo Hospital and UOL Hospital Lahore. We offer hospital design and construction, MEP and firefighting systems and hospital interiors under one team. See our hospital projects or request a feasibility estimate.

Frequently Asked Questions

How much does it cost to build a 100-bed hospital in Pakistan?

For a mid-level private hospital, roughly PKR 600 to 800 million for the building, finishes and MEP in 2026, excluding land and medical equipment. Tertiary or ICU-heavy hospitals cost more.

What is the cost of building a small clinic in Pakistan?

A fully finished clinic of 2,000 to 4,000 sq ft typically costs about PKR 6,000 to 9,000 per sq ft depending on HVAC, procedure rooms and finishes, excluding land and equipment.

What is hospital construction cost per square foot?

It depends on specialty and systems. As a rough guide, complete hospital buildings in Pakistan range from about PKR 6,000 to over 11,000 per sq ft excluding equipment, with OT, ICU and imaging zones at the top of that range.

Is medical equipment included in hospital construction cost?

Usually not. Equipment is budgeted separately unless the contract is a full turnkey package that includes procurement and installation of medical equipment.

How long does it take to build a hospital?

A 50 to 100 bed hospital typically takes 18 to 30 months from design start to commissioning, depending on approvals, basements, MEP complexity and funding flow.

Contact ACCO

Planning a Project with ACCO?

Architecture, engineering and construction from one Lahore team since 1998. Design drawings are free when ACCO is awarded the construction.

Discuss Your ProjectWhatsApp +92 322 8000190

Tanveer Ahmed is the CEO of Ahmed Construction Company (ACCO), a Lahore-based architecture, engineering and construction firm operating since 1998. He has led ACCO since 2005, delivering hospital projects such as LDMC, MCH Islamkot and work at King Edward Medical University / Mayo Hospital and UOL Hospital Lahore, along with residential construction in DHA and Bahria Town, commercial buildings, MEP systems and turnkey projects across Pakistan.

WhatsApp