Home Renovation Cost in DHA Lahore (2026-27): Kitchen, Bathroom and Full-House Budgets

10 Marla Front Elevation Design DHA Lahore | ACCO Experts

Home Renovation Cost in DHA Lahore (2026-27): Kitchen, Bathroom and Full-House Budgets

By , CEO, Ahmed Construction Company (ACCO) · Updated · Reviewed by ACCO architects and engineers

Since 1998Design and construction in Lahore
Based in Gulberg-IIIHead office in Lahore
Architects + EngineersArchitecture, structure and MEP in-house
Free DrawingsOn award of construction

Quick Answer

Home renovation cost in DHA Lahore 2026: Rs 3,900-5,300 per sq ft full house, kitchen from Rs 2 lakh, bathroom from Rs 3 lakh. Get a free site visit from ACCO. Ahmed Construction Company (ACCO), based in Gulberg-III Lahore since 1998, provides house renovation in Lahore with design drawings free on award of construction.

Home renovation cost in DHA Lahore depends on what you want to change and on the condition of the house behind the finishes. In 2026-27, ACCO’s indicative range for a complete renovation that replaces all finishes is about PKR 3,900 to 5,300 per square foot of covered area, plus any structural, roof or waterproofing repairs found during inspection. Partial renovations of a kitchen, bathrooms, paint or floors cost far less. This guide explains the budgets by scope, what drives cost in DHA, the permissions involved, and how to plan a renovation without surprises.

Figures are indicative estimates as of October 2026. Every renovation quote should follow a site inspection and an itemised BOQ.

Home Renovation Cost in DHA Lahore at a Glance

Complete renovationAbout PKR 3,900 to 5,300 per sq ft of covered area (indicative, 2026-27), excluding structural repairs
KitchenAbout PKR 2 to 4 lakh basic refresh, PKR 5 to 9 lakh mid-range, PKR 15 lakh or more premium, excluding appliances
BathroomAbout PKR 3 to 7 lakh standard, PKR 8 lakh or more premium with imported fittings
ApprovalsDHA renovation procedures for material and debris; approved drawings from DHA Building Control for structural or elevation changes
Pricing methodSite inspection, then an itemised BOQ; see the DHA house construction cost guide for new-build rates

Home Renovation Cost by Scope

Renovations range from a fresh coat of paint to stripping the house back to its structure. The table below shows typical scopes and how they are priced.

Renovation scopeWhat it includesIndicative cost (2026-27)
Cosmetic refreshPaint, minor repairs, light fittings, door and window touch-upsPriced per room or per sq ft after inspection
Kitchen renovationCabinets, countertop, sink, tiles, lighting, plumbing and electrical pointsPKR 2 to 4 lakh basic; 5 to 9 lakh mid-range; 15 lakh or more premium
Bathroom renovationWaterproofing, concealed pipes, tiles, sanitary ware, vanity, fittingsPKR 3 to 7 lakh standard; 8 lakh or more premium
FlooringRemoval of old floors, levelling, new tiles, marble or woodPer sq ft, depending on material
Complete renovationAll finishes, services upgrade, kitchens, bathrooms, woodwork, paintAbout PKR 3,900 to 5,300 per sq ft of covered area

Rates in DHA and Gulberg often run about 10 to 15 percent above LDA areas because of access rules, working-hour restrictions and higher finish expectations.

Budgets by House Size

A complete renovation budget scales with covered area, not plot size. A typical double-storey house has much more covered area than its plot size suggests, and a basement adds further area. To estimate:

  1. Measure the total covered area of all floors to be renovated.
  2. Multiply by the indicative per-sq-ft range for your finish level.
  3. Add structural, roof and waterproofing repairs found during inspection.
  4. Add a contingency of about 10 percent for hidden defects.

For example, if only the ground floor of a 10 marla house is being redone, the budget is calculated on that floor’s covered area only. ACCO provides the exact figure after measuring the house and agreeing a specification.

What Drives Renovation Cost in DHA

Condition of the house

Seepage, roof leaks, cracked slabs or old galvanised pipes must be fixed before new finishes go on.

Scope creep

Opening one wall often reveals wiring or plumbing that needs replacing. A clear scope and a contingency avoid disputes.

Finish specification

Local versus imported tiles, sanitary ware and kitchen hardware can double a room’s cost.

Living in during works

Phasing the work around an occupied house takes longer and costs more in protection and cleaning.

DHA permissions

Material stacking, debris removal and working hours follow DHA procedures; structural changes need approved drawings.

MEP upgrades

Rewiring, new distribution boards, solar, VRF or inverter AC piping add cost but are cheapest to do during a renovation.

DHA Permissions for Renovation

Internal finishing work usually needs only DHA’s renovation procedures covering material stacking, debris and contractor access. Structural changes, extensions, new floors or changes to the front elevation need drawings approved by DHA Building Control, prepared by a registered architect and checked by a structural engineer. Always confirm the current rules on dhalahore.org or with DHA Building Control before starting. Structural design should follow the Building Code of Pakistan.

Kitchen Renovation: Where the Money Goes

  • Cabinets: the largest item; board type, hardware and finish decide the cost.
  • Countertop: granite, quartz or solid surface, each at a different price point.
  • Services: new plumbing, gas points, electrical circuits for appliances and a proper exhaust.
  • Finishes: wall and floor tiles, ceiling and lighting.

Keeping the sink and cooking range in the same place saves money on plumbing, gas and exhaust work.

Bathroom Renovation: Doing It Properly

Bathrooms are where poor renovation shows first. A proper bathroom renovation includes removal down to the slab, new concealed pipes, a tested waterproofing layer, correct floor slopes to drains, then tiling and fixtures. Skipping waterproofing to save cost often leads to seepage into the room below within a year or two.

How to Plan a Renovation Step by Step

1. Inspection

Check structure, roof, damp, wiring and plumbing before choosing finishes.

2. Design and scope

Layouts, 3D views and a written specification for every room.

3. BOQ and schedule

Item-wise cost and a phased programme, including any DHA permissions.

4. Execution and handover

Repairs first, then services, then finishes, with a snag list at the end.

Ways to Control Renovation Cost

  • Fix leaks and damp first; new finishes over damp walls fail quickly.
  • Keep wet areas in the same place to avoid moving drains.
  • Refinish good-quality existing woodwork instead of replacing it.
  • Choose one tile range for several rooms to get better pricing.
  • Upgrade wiring and plumbing while walls are open, not later.
  • Hold a 10 percent contingency for hidden defects.
  • Agree the specification in writing before work starts, so the BOQ does not change mid-way.

Upgrading Services During a Renovation

Many DHA houses built fifteen or more years ago were not designed for today’s electrical loads, inverter air-conditioners, solar systems or modern plumbing. A renovation is the right moment to upgrade these, because the walls and ceilings are already open.

Electrical

  • Replace old wiring and undersized distribution boards
  • Add dedicated circuits for air-conditioners, kitchen appliances and water heaters
  • Provide proper earthing and circuit breakers with earth-leakage protection
  • Plan conduits for solar, inverter and data cabling

Plumbing

  • Replace corroded galvanised iron pipes with modern pressure pipes
  • Check sewer lines and manholes for blockages and cracks
  • Size water tanks and pumps for the family’s actual use

Comfort and energy

Roof insulation, better windows and shading can noticeably reduce cooling bills. If you plan rooftop solar, check that the roof is waterproofed first and that the structure can take the panel frames.

Choosing a Renovation Contractor

The cheapest quote is rarely the cheapest renovation. Before appointing a contractor, check that they:

  • Inspect the house before quoting, rather than giving a rate over the phone
  • Provide an itemised BOQ with brands and specifications
  • Have engineers who can assess structural and seepage problems
  • Understand DHA procedures for working hours, materials and debris
  • Offer a written schedule and a defects period after handover

Renovation Timelines

A kitchen typically takes about 2 to 6 weeks, a bathroom 1 to 3 weeks, and a complete 10 marla renovation usually 3 to 6 months, depending on scope, approvals and whether the family stays in the house. Imported materials can add lead time, so order them early.

Renovate Your DHA Home with ACCO

Ahmed Construction Company (ACCO) has designed and built in Lahore since 1998, with architects, engineers and interior designers in-house. See our home renovation service in DHA Lahore, house renovation in Lahore and interior design services.

Frequently Asked Questions

How much does it cost to renovate a house in DHA Lahore?

A complete renovation that replaces all finishes costs about PKR 3,900 to 5,300 per sq ft of covered area in 2026-27 (indicative), plus any structural repairs. Partial renovations cost much less.

How much does a kitchen renovation cost in Lahore?

Roughly PKR 2 to 4 lakh for a basic refresh, PKR 5 to 9 lakh for mid-range custom cabinets, and PKR 15 lakh or more for premium kitchens, excluding appliances.

How much does a bathroom renovation cost in Lahore?

ACCO’s indicative estimate is about PKR 3 to 7 lakh for a standard bathroom and PKR 8 lakh or more for premium bathrooms with imported fittings, including waterproofing and concealed pipes.

Do I need DHA permission to renovate my house?

Internal finishing usually needs only DHA’s renovation procedures for material and debris. Structural changes, extensions or elevation changes need approved drawings from DHA Building Control.

How long does a house renovation take?

A kitchen takes about 2 to 6 weeks, a bathroom 1 to 3 weeks, and a complete 10 marla renovation usually 3 to 6 months depending on scope.

Is it cheaper to renovate or rebuild?

Renovation is usually cheaper when the structure is sound. If the structure has serious defects or the layout no longer works, rebuilding may be better value. An inspection and comparison of BOQs answers this.

Can I live in the house during a renovation?

Often yes for partial renovations, if work is phased room by room and dust and debris are controlled. For a complete renovation, moving out usually shortens the programme, reduces protection and cleaning costs and is safer for children and elderly family members.

Conclusion

Home renovation cost in DHA Lahore is driven by scope, the hidden condition of the house and the finish level you choose. Inspect first, fix structure and damp before finishes, agree a written specification and an itemised BOQ, and keep a contingency. That approach keeps the budget under control and produces a renovation that lasts.

Contact ACCO

Planning a Project with ACCO?

Architecture, engineering and construction from one Lahore team since 1998. Design drawings are free when ACCO is awarded the construction.

Discuss Your ProjectWhatsApp +92 322 8000190

Tanveer Ahmed is the CEO of Ahmed Construction Company (ACCO), a Lahore-based architecture, engineering and construction firm operating since 1998. He has led ACCO since 2005, delivering hospital projects such as LDMC, MCH Islamkot and work at King Edward Medical University / Mayo Hospital and UOL Hospital Lahore, along with residential construction in DHA and Bahria Town, commercial buildings, MEP systems and turnkey projects across Pakistan.