Feasibility Study for Hospital Construction in Pakistan: A Complete Guide
By Tanveer Ahmed, CEO, Ahmed Construction Company (ACCO) · Updated · Reviewed by ACCO architects and engineers
Quick Answer
A feasibility study for hospital construction in Pakistan tests demand, site, licensing, cost and operations before design starts. What it covers and why. Ahmed Construction Company (ACCO), based in Gulberg-III Lahore since 1998, provides hospital design & construction services with design drawings free on award of construction.
A feasibility study for hospital construction is the work that decides whether a hospital should be built at all, and if so, what kind, how large, where and at what budget. In Pakistan, where land is expensive, regulation is tightening and specialist staff are hard to recruit, skipping this step is the most common reason hospital projects stall halfway or open with empty beds. This guide explains what a hospital feasibility study covers, how it is carried out, what it costs to get wrong, and how its findings flow into design and construction.
Hospital Feasibility Study at a Glance
| Purpose | Test whether a proposed hospital is needed, buildable, licensable and financially sustainable before money is committed to design and construction |
|---|---|
| Main parts | Market and demand study, site evaluation, clinical brief and space programme, regulatory review, cost estimate, operating model and financial projections |
| Who uses it | Owners, doctor-investors, banks and lenders, boards of trusts and NGOs, and the design team |
| Key references | Punjab Healthcare Commission licensing standards, the Building Code of Pakistan (PEC), and WHO health-facility guidance |
| Output | A written report with a recommended scope, phasing plan, outline BOQ and a clear go / no-go recommendation |
| ACCO service | Hospital feasibility services linked to design and turnkey hospital construction |
What Is a Feasibility Study for Hospital Construction?
A hospital feasibility study is a structured investigation carried out before design begins. It answers four questions in order: is there enough demand for the services proposed, can those services be delivered on the chosen site, will the authorities license the facility, and will the hospital earn enough (or receive enough funding) to cover its costs over time?
It is different from a general property feasibility. A shopping plaza succeeds if it attracts tenants. A hospital succeeds only if it attracts patients, recruits qualified doctors and nurses, meets clinical standards and keeps its equipment running. All of these have to be tested on paper first.
When it should be done
The study should start once an owner has a site in mind (or two or three options) and a broad idea of the services they want to offer, and before an architect is asked to produce drawings. Feasibility work done after design has started tends to justify decisions already made instead of testing them.
Why Feasibility Matters for Hospitals in Pakistan
Hospital investment in Pakistan carries risks that are specific to the local market:
- Uneven demand. Some city areas have several private hospitals within a short drive, while nearby towns have very limited specialist care. Building in the wrong place means competing for the same patients.
- Licensing requirements. Provincial healthcare commissions set minimum standards for space, staffing, equipment and infection control. A building that does not meet them cannot open as planned.
- Staffing. Consultants, anaesthetists, ICU nurses and biomedical engineers are scarce outside major cities. A plan that ignores this will struggle to run its departments.
- Utilities. Power reliability, water supply and sewerage capacity vary widely between sites and directly affect plant and building costs.
- Cost volatility. Steel, cement, copper and imported equipment prices move with exchange rates, so budgets need contingencies.
The Six Parts of a Hospital Feasibility Study
1. Market and demand
Population in the catchment area, existing hospitals and clinics, services that are missing, likely patient mix (private, insured, panel or welfare) and referral patterns.
2. Site evaluation
Road access for ambulances and the public, plot size and shape, permitted height and coverage, soil conditions, flood risk, and power, water and sewer connections.
3. Clinical brief
Which departments, how many beds, theatres, ICU beds and consulting rooms, and which services start on day one versus later phases.
4. Regulatory review
Building approval route (development authority, cantonment or municipal), healthcare commission licensing, environmental approval and fire safety requirements.
5. Capital cost
Land, civil works, MEP, medical gases, finishes, medical equipment, furniture, IT, professional fees and contingency, built up as an outline BOQ.
6. Operations and finance
Staffing plan, running costs, expected patient volumes, tariffs, ramp-up period and cash flow over the first years of operation.
Market and Demand Analysis
Demand analysis is the foundation of the study. It looks at the population living within a realistic travel time of the site, its age profile and income levels, and how residents currently obtain care. Data sources include the census, district health information, existing hospitals’ service lists and interviews with local doctors.
The goal is not to prove that a hospital is needed in general, but to find the specific services that are under-supplied. A town may already have enough general beds but lack dialysis, cardiac diagnostics or a proper maternity unit. Focusing on gaps gives a new hospital a reason to exist and a better chance of filling its beds.
Site Evaluation and Technical Feasibility
A site that looks attractive on a map can be unsuitable for a hospital. The technical review checks:
- Separate access points for ambulances, outpatients, staff, supplies and waste
- Building bye-laws on setbacks, floor area ratio, height and parking from the local authority, such as the Lahore Development Authority
- Soil investigation results and foundation implications, including seismic zone
- Electrical load available from the distribution company and space for transformers and generators
- Water source, storage and sewer or treatment arrangements
- Room for future expansion of beds, imaging or plant
For conversion projects, where an existing house or commercial building is turned into a hospital, the structure must also be checked for floor loads, floor-to-floor heights for ducts, lift space and fire escape routes. Many buildings fail these tests and are better replaced than converted.
Clinical Brief and Space Programme
Once demand and site are understood, the study defines what will be built. The clinical brief lists departments and their capacities; the space programme converts these into room-by-room areas. Our guide to the complete list of hospital departments is a useful starting point for this exercise.
A good brief also decides phasing. Many successful private hospitals in Pakistan open with outpatients, diagnostics, a modest number of beds and one or two theatres, then add specialties as demand and staffing allow. Structure, shafts and plant should be sized for the final phase even if fit-out is staged.
Financial Feasibility: Capital and Operating Costs
The financial section brings everything together. Capital cost is built up from the space programme and specification rather than from a single rate per square foot, because a hospital with several theatres and an ICU costs far more per square foot than one that is mostly wards and clinics. ACCO prices every project through an itemised BOQ; the hospital construction cost guide for Pakistan explains the main cost drivers, and our article on hospital BOQ and cost estimation shows how estimates are prepared.
Operating projections cover salaries, consumables, utilities, maintenance, insurance and financing costs, set against expected income from consultations, admissions, procedures and diagnostics. The ramp-up period matters: a new hospital rarely reaches full occupancy in its first year, and the study should show how the owner will fund that gap.
Feasibility study versus skipping it
| Area | With a feasibility study | Without one |
|---|---|---|
| Services offered | Matched to local gaps | Copied from competitors |
| Building size | Based on demand and phasing | Based on plot size or budget alone |
| Licensing | Requirements built into the brief | Problems found at inspection |
| Budget | Outline BOQ with contingency | Single rate per square foot, frequent overruns |
| Financing | Lender-ready projections | Harder to secure loans or investors |
| Opening | Staffing and ramp-up planned | Delays while staff and equipment are found |
Regulatory and Approval Feasibility
Two sets of approvals apply. The building needs planning and building approval from the relevant development authority, cantonment board or municipal body. The hospital as a healthcare establishment must be registered and licensed by the provincial healthcare commission, which in Punjab is the Punjab Healthcare Commission. Its minimum service delivery standards influence room sizes, department layouts and support facilities. See our summary of Punjab Healthcare Commission hospital requirements.
Environmental approval, fire safety design and hospital waste management arrangements should also be confirmed at feasibility stage, as each can affect the site layout.
How the Feasibility Process Runs
Inception
Owner’s objectives, budget range, site options and services in mind are recorded.
Research
Demand data, site surveys, utility checks and regulatory review are completed.
Options
Two or three scope and phasing options are tested on cost and operation.
Report
A recommended option, outline BOQ, programme and go / no-go advice are presented.
Common Mistakes in Hospital Feasibility
- Assuming high occupancy from the first month of operation
- Estimating cost from a single per-square-foot rate
- Leaving out medical equipment, IT, furniture and pre-opening costs
- Ignoring the availability of specialist doctors and nurses in the area
- Choosing a building for conversion without checking structure and services
- Treating licensing requirements as something to deal with after construction
Frequently Asked Questions
What does a hospital feasibility study include?
It covers market demand, site evaluation, the clinical brief and space programme, regulatory requirements, capital cost estimates and operating and financial projections, ending with a recommendation on whether and how to proceed.
How long does a hospital feasibility study take?
It depends on the size of the project and how much information is already available. A study for a small hospital is shorter than one for a large multi-specialty hospital with several site options.
Do banks require a feasibility study for hospital loans?
Lenders usually expect a credible business plan with cost estimates and income projections. A properly prepared feasibility study provides most of this information.
Can a feasibility study tell me if my house can become a hospital?
Yes. The technical review checks structure, floor heights, access, fire escape and services, and the regulatory review checks whether the location and building can be licensed as a healthcare establishment.
How much does it cost to build a hospital in Pakistan?
There is no single figure. Cost depends on beds, departments, specification and site. ACCO prepares an itemised BOQ for each project; the hospital construction cost guide explains the main factors.
Does ACCO carry out hospital feasibility studies?
Yes. ACCO provides feasibility, design, approvals support and turnkey construction, so the findings of the study carry directly into the design and BOQ.
Conclusion
A feasibility study for hospital construction costs little compared with the building it informs, yet it shapes every decision that follows: the services offered, the size of the building, the budget and the opening plan. Owners who invest time in it build hospitals that are licensable, affordable and busy from the start, rather than discovering problems after the concrete has set.
Related articles
Contact ACCO
- +92 322 8000190
- info@acco.com.pk
- Office 2, 3rd Floor, Bigcity Plaza, Gulberg-III, Lahore
Planning a Project with ACCO?
Architecture, engineering and construction from one Lahore team since 1998. Design drawings are free when ACCO is awarded the construction.
Discuss Your ProjectWhatsApp +92 322 8000190