Quick contact info

Welcome to Ahmed Construction Company – your partner for innovative and high-quality construction. From residential to commercial projects, we turn dreams into reality with precision and reliability. Building a future of excellence, one project at a time.

icon_widget_image Monday to Saturday: 9:00 AM to 6:00 PM icon_widget_image Office 2, 3rd Floor, Bigcity Plaza, Gulberg-III, Lahore icon_widget_image +92-322-8000190 +92-311-749849 icon_widget_image info@acco.com.pk

Bahria Town Lahore Map Approval & Building Rules Guide (2026-27)

Planning to build in Bahria Town Lahore? This guide explains the house map approval and completion process step by step, what Bahria Town’s building rules control, the documents you need and the mistakes that cause delays. Prepared by Ahmed Construction Company (ACCO), which prepares and follows up submissions for its clients.

Quick answer

To build in Bahria Town Lahore you need society-approved drawings before construction starts. Take possession and demarcation, get a soil test, prepare architectural and structural drawings to Bahria Town’s building rules (structural drawings signed by a PEC-registered engineer), submit them with fees, clear any observations, build exactly to the approved map and obtain completion. Rules on setbacks, covered area, height and basements vary by plot size and block, so confirm the current requirements for your plot.

Luxury white classic mansion with mansard roof, columns and iron balconies in DHA Lahore
Luxury classic mansion with mansard roof, columns and iron balconies.

Have a plot in Bahria Town Lahore? Share your plot size, sector or block and whether you need grey structure or turnkey. ACCO will visit your plot and give you a free itemised estimate. Call or WhatsApp 0322-8000190 or send your plot details.

Bahria Town Map Approval: Step by Step

  1. Possession and demarcation of the plot and levels.
  2. Soil investigation for foundation design.
  3. Design to the rules for your plot size and block.
  4. Structural drawings signed by a PEC-registered engineer.
  5. Submission to Bahria Town’s town planning / building control office with documents and fees.
  6. Observations answered until approval.
  7. Construction to the approved map with stage inspections.
  8. Completion after final inspection.

What Bahria Town’s Building Rules Control

  • Setbacks: front, rear and side open spaces by plot size.
  • Covered area: ground and first-floor limits, and how basements and mumty count.
  • Height and storeys.
  • Basements: permitted extent, ventilation and light wells.
  • Boundary wall, gate, ramp and porch dimensions.
  • Site rules: working hours, material storage, road and neighbour protection.

ACCO confirms the latest requirements for your plot with Bahria Town before finalising the design. Engineers must be registered with the Pakistan Engineering Council.

Documents Typically Needed

  • Allotment, ownership and possession documents
  • Owner’s CNIC copy
  • Architectural drawings: site plan, floor plans, sections, elevations
  • Structural drawings with engineer registration details
  • Soil test report where required
  • Paid fee challans and dues clearance

Confirm the exact list with Bahria Town, as requirements change.

6 Mistakes That Delay Approval or Completion

  1. Exceeding covered area or ignoring setbacks.
  2. Missing or unsigned structural drawings.
  3. Starting before approval.
  4. Changing the layout on site without revising the map.
  5. Boundary wall, ramp or porch outside permitted lines.
  6. Unpaid dues at completion stage.

Bahria Town Map Approval: FAQs

How do I get my house map approved in Bahria Town Lahore?

Take possession, get a soil test, prepare architectural and structural drawings to Bahria Town’s rules, submit them with fees, clear any observations and build to the approved map.

Can I start construction before approval in Bahria Town?

No. Building before approval risks penalties, stop-work orders and problems with completion.

Who signs structural drawings for Bahria Town?

A structural engineer registered with the Pakistan Engineering Council (PEC).

Do Bahria Town rules differ by plot size?

Yes. Setbacks, covered area and other controls vary by plot size and block, so confirm the current rules for your plot.

Does ACCO handle Bahria Town map approval?

Yes. ACCO prepares the drawings, submits and follows up, and manages completion as part of its design-and-build service.

Get Help With Your Bahria Town Approval

Send your plot size, Bahria Town sector or block and requirements. ACCO will visit your plot and prepare a free design concept and itemised estimate.

Call / WhatsApp: 0322-8000190 · Email: info@acco.com.pk · Contact form

Ahmed Construction Company (ACCO), Office 2, 3rd Floor, Big City Plaza, Gulberg-III, Lahore