Quick contact info

Welcome to Ahmed Construction Company – your partner for innovative and high-quality construction. From residential to commercial projects, we turn dreams into reality with precision and reliability. Building a future of excellence, one project at a time.

Monday to Saturday: 9:00 AM to 6:00 PM Office 2, 3rd Floor, Bigcity Plaza, Gulberg-III, Lahore +92-322-8000190 +92-322-8000190 info@acco.com.pk
Worked with ACCO?Scan to share your experience on Google.
Review us on Google →
Commercial plaza lobby and reception finishing with lifts, marble and cove lighting

Commercial Plaza Renovation Services in Lahore

By , CEO, Ahmed Construction Company (ACCO) · Updated · Reviewed by ACCO architects and engineers

Since 1998Design and construction in Lahore
Based in Gulberg-IIIHead office in Lahore
Architects + EngineersArchitecture, structure and MEP in-house
Free DrawingsOn award of construction

Quick Answer

Commercial plaza renovation in Lahore: facades, lobbies, toilets, building services and fit-outs, surveyed and scoped by ACCO. Request a site inspection. Ahmed Construction Company (ACCO), based in Gulberg-III Lahore since 1998, provides house renovation in Lahore with design drawings free on award of construction.

ACCO – Ahmed Construction Company · Updated 23 October 2026 · Reviewed by ACCO architects and engineers

Commercial Renovation · Lahore · Since 1998

Commercial Plaza Renovation Services in Lahore

Facades, entrances, lobbies, toilets, common areas, building services and tenant spaces in existing commercial plazas, surveyed, scoped and priced before any work starts.

Request a Site InspectionWhatsApp 0322-8000190

Commercial plaza lobby and reception with lifts, marble flooring and cove lighting
Since 1998Construction and renovation in Lahore
Design + BuildArchitects, engineers and builders in-house
Survey FirstExisting-condition review before scope
Itemised BOQClear scope and pricing basis

Quick Answer

Commercial plaza renovation upgrades an existing commercial building: its facade and entrance, lobbies and corridors, toilets and shared areas, shops and offices, and, where needed, its electrical, plumbing and other building services. In Lahore, ACCO starts with a site inspection and existing-condition review, defines the scope with you, coordinates any design and engineering, and prices the work through an itemised BOQ. Cost depends on the building’s size, condition and the scope chosen, so ACCO does not quote a single rate before seeing the building.

Plaza Renovation with ACCO at a Glance

ServiceRenovation, refurbishment and remodelling of existing commercial plazas and buildings
AreaLahore
Typical areasFacade and entrance, lobbies, corridors, stairs, toilets, shops, offices, services
Starting pointSite inspection and existing-condition review
How it is pricedItemised BOQ for the agreed scope
Occupied buildingsPhasing and working arrangements agreed per project
Related servicesNew plaza construction · commercial interiors
Contact0322-8000190 · info@acco.com.pk · Office 2, 3rd Floor, Bigcity Plaza, Gulberg-III, Lahore

Why Owners Renovate Commercial Plazas

Older plazas often show their age in tired facades, dark lobbies, worn toilets, leaking roofs and services that no longer suit how tenants use the building. Renovation can improve how the building works, how it looks, how easily it is maintained, and how safely people move through it.

The right scope depends on the building. ACCO reviews the existing structure, finishes and services first, then agrees with you what is worth upgrading now and what can be phased.

Renovation outcomes such as rents, occupancy or property value depend on many factors outside construction, so ACCO does not promise them.

Commercial plaza lift lobby with feature wall and cove ceiling
Lift lobby finishing in a commercial plaza.

Types of Commercial Renovation Projects

Older Plaza Refurbishment

Repairs and upgrades across finishes, common areas and services of an ageing building.

Retail and Showroom Units

New shopfronts, floors, ceilings, lighting and layouts for ground-floor retail. See shop renovation.

Office Floors

Partitions, ceilings, lighting, flooring and toilets for office tenants.

Lobby and Common Areas

Entrances, receptions, corridors, lift lobbies and stairs.

Facade and Entrance

Cladding, glazing, canopies, signage zones and entrance upgrades.

Tenant Fit-Outs

Shell units finished to a tenant’s brief. See plaza finishing and fit-out.

Approved Extensions

Additional floors or areas only after structural review and approval.

Phased Projects

Work split into stages by floor, zone or budget.

Waterproofing and Repairs

Roof leaks, water ingress, damp and damaged finishes.

Facade and Elevation Renovation

A facade upgrade starts with the existing wall, not the new material. ACCO reviews:

  • The condition of the existing facade, plaster, cladding and glazing
  • The structure and fixing points the new system will hang from
  • Weather exposure, waterproofing and drainage
  • Fire requirements for the materials chosen
  • Signage zones for tenants
  • How the facade will be cleaned and maintained

Materials such as ACP, stone, glass or louvres are only recommended once these are known. See curtain wall and facade work and plaza facade design ideas.

Commercial plaza glass facade and curtain wall finishing work
Glass facade and curtain wall finishing.

Interior and Common-Area Renovation

Lobbies and Reception

Flooring, wall finishes, ceilings, lighting and reception counters.

Corridors and Lift Lobbies

Durable finishes, lighting and clear circulation.

Stairs and Circulation

Treads, railings, lighting and safe, unobstructed routes.

Toilets and Shared Facilities

New sanitary fittings, tiling, drainage, ventilation and partitions.

Shops and Offices

Layouts, partitions, floors, ceilings and lighting for units.

Signage and Wayfinding

Directory boards, floor signs and unit numbering.

Commercial plaza washroom with toilet cubicles and vanity counter
Shared washroom finishing in a commercial plaza.

Building Services and Safety Upgrades

Before upgrading, the existing systems are assessed: electrical supply and distribution, plumbing and drainage, HVAC and ventilation, lifts, and fire detection and life-safety systems.

What is needed depends on the building, its occupancy, the existing systems and the requirements of the relevant authorities. Where specialist systems such as lifts, HVAC or fire detection are in scope, the work is carried out by qualified specialists and the arrangement is written into the contract.

Renovation by itself does not guarantee compliance with any code or authority requirement. Compliance is checked against the specific building and approvals.

Wall chasing for new electrical conduits during renovation
New conduits being chased into walls during renovation.

Structural Assessment and Alterations

Some renovation changes affect the structure: adding floors, removing or cutting walls and slabs, new openings, heavy equipment on roofs, or major facade changes. These need a structural assessment by qualified engineers and the required approvals before work starts.

ACCO does not remove structural elements or add load without engineering review. Related service: structural stability assessment. For larger extensions, see plaza extension and remodelling.

Structural repair work with temporary steel props supporting a slab
Temporary props during structural repair.

Renovating a Plaza While Tenants Operate

Many plazas stay open during renovation. Whether that is possible, and how, is agreed for each project. The plan usually covers:

Sequencing and Access

Which floors or zones are worked on, and when.

Barriers and Signage

Hoarding, temporary signs and protected walkways.

Noise and Dust

Working hours, dust screens and cleaning.

Deliveries and Storage

Material timings, routes and storage space.

Safe Exits

Emergency routes kept clear throughout.

Tenant Coordination

Notice of works and planned service shutdowns.

Our Renovation Process

Consultation

Your goals, budget and timeline.

Site Inspection

Existing-condition review of structure, finishes and services.

Scope and Investigations

Agreed scope and any tests or surveys needed.

Design and Engineering

Drawings and coordination for the chosen works.

BOQ and Estimate

Itemised quantities, specifications and price.

Approvals and Planning

Required approvals, phasing and site rules.

Procurement and Setup

Materials ordered; site protected and set up.

Execution

Renovation works under site supervision.

Checks and Commissioning

Quality checks and testing of services where applicable.

Handover

Snag list closed and areas handed back.

What Affects Commercial Plaza Renovation Cost

Renovation cost is set by the scope and the building, so it is priced after inspection through an itemised BOQ. The main factors:

Size and Condition

Floor area, number of floors and the state of the building.

Facade Work

Material choice and how much existing facade is replaced.

Structural Repairs

Cracks, corrosion, strengthening or alterations.

Finish Specification

Grade of flooring, ceilings, wall finishes and fittings.

Services Upgrades

Electrical, plumbing, HVAC and fire systems.

Lift Work

Repair, upgrade or replacement of lifts.

Access Equipment

Scaffolding and access for facade and high-level work.

Occupancy and Phasing

Working around tenants and out-of-hours work.

Protection and Waste

Protecting finished areas and removing debris.

Design, engineering and approval requirements are also priced into the estimate. For new-build figures, see the commercial plaza construction cost guide.

Request a Renovation Estimate

Commercial Plaza Renovation: FAQs

What does commercial plaza renovation include?

It can include facade and entrance upgrades, lobby, corridor and stair refurbishment, toilet upgrades, shop and office renovation, waterproofing, and electrical and plumbing upgrades. The exact scope is agreed after a site inspection.

Can a commercial plaza be renovated while tenants are operating?

Often yes, with phased work, barriers, controlled working hours and planned service shutdowns. Whether it is possible is agreed for each building and scope.

How is renovation cost estimated?

ACCO inspects the building, agrees the scope and prepares an itemised BOQ with quantities, specifications and prices. Size, condition, facade work, services upgrades, lift work, access equipment and phasing all affect the total.

Can ACCO renovate a facade or entrance?

Yes. Facade and entrance work starts with a review of the existing facade, structure, fixings, waterproofing and fire requirements before materials are selected.

Are electrical and fire-safety upgrades included?

Only if they are in the agreed scope. Existing systems are assessed first, and specialist systems are carried out by qualified specialists under the contract.

Is a structural assessment required before alterations?

Yes, for any work that affects the structure, such as new openings, removed walls, added floors, heavy equipment or major facade changes.

Which approvals may be needed?

It depends on the building, its location and the work. Structural alterations, extensions and changes of use typically need approval from the relevant development authority. ACCO confirms the requirements for your building before work starts.

How can a property owner request an estimate?

Call or WhatsApp 0322-8000190 or email info@acco.com.pk with the building location, number of floors, approximate age, current condition, areas to renovate, any drawings or reports, photos, and whether tenants will remain during work.

Discuss Your Commercial Plaza Renovation

Share your building location, number of floors, approximate age, current condition, areas to renovate, drawings or inspection reports, photos, and whether tenants will stay during work. ACCO will arrange a site inspection.

WhatsApp 0322-8000190Share Your Building Requirementsinfo@acco.com.pk

Contact ACCO

Planning a Project with ACCO?

Architecture, engineering and construction from one Lahore team since 1998. Design drawings are free when ACCO is awarded the construction.

Discuss Your ProjectWhatsApp +92 322 8000190

Tanveer Ahmed is the CEO of Ahmed Construction Company (ACCO), a Lahore-based architecture, engineering and construction firm operating since 1998. He has led ACCO since 2005, delivering hospital projects such as LDMC, MCH Islamkot and work at King Edward Medical University / Mayo Hospital and UOL Hospital Lahore, along with residential construction in DHA and Bahria Town, commercial buildings, MEP systems and turnkey projects across Pakistan.

WhatsApp