Quick contact info

Welcome to Ahmed Construction Company – your partner for innovative and high-quality construction. From residential to commercial projects, we turn dreams into reality with precision and reliability. Building a future of excellence, one project at a time.

Monday to Saturday: 9:00 AM to 6:00 PM Office 2, 3rd Floor, Bigcity Plaza, Gulberg-III, Lahore +92-322-8000190 +92-322-8000190 info@acco.com.pk
Worked with ACCO?Scan to share your experience on Google.
Review us on Google →

Remodeling Cost per Sq Ft in DHA Lahore (2026-27): How It Is Worked Out

Per Square Foot Remodeling Costs in DHA Lahore

Remodeling Cost per Sq Ft in DHA Lahore (2026-27): How It Is Worked Out

By , CEO, Ahmed Construction Company (ACCO) · Updated · Reviewed by ACCO architects and engineers

Since 1998Design and construction in Lahore
Based in Gulberg-IIIHead office in Lahore
Architects + EngineersArchitecture, structure and MEP in-house
Free DrawingsOn award of construction

Quick Answer

Remodeling cost per sq ft in DHA Lahore 2026-27: what drives renovation rates for kitchens, bathrooms, finishes, elevation and full homes, and how BOQs work. Ahmed Construction Company (ACCO), based in Gulberg-III Lahore since 1998, provides house construction in Lahore with design drawings free on award of construction.

Remodeling cost per sq ft in DHA Lahore is one of the most searched questions by homeowners planning a renovation, and also one of the most misleading. A single rate per square foot hides huge differences: repainting and new lights in a living room cost a fraction of gutting a kitchen, re-plumbing bathrooms and replacing every floor. This guide explains how remodeling costs are actually worked out in DHA Lahore in 2026-27, which scopes of work drive the price, what affects rates up or down, and why an itemised bill of quantities gives a far more reliable budget than any per-square-foot figure.

Remodeling Cost per Sq Ft in DHA Lahore at a Glance

How cost is measuredBy scope of work and itemised quantities, not a single flat rate
Biggest cost driversStructural changes, kitchens, bathrooms, MEP replacement, finish grade, elevation work
ApprovalsStructural changes, additions and elevation changes may need approval from DHA Lahore
EngineeringStructural work should be checked by a registered engineer under PEC rules and the Building Code of Pakistan
PricingACCO prices every renovation through an itemised BOQ; see the construction cost per square foot guide

Why a Single Per-Square-Foot Rate Is Misleading

For new construction, a per-square-foot figure is a reasonable starting point because most houses include the same elements: foundations, frame, walls, roof, services and finishes. Remodeling is different. Every renovation has a different scope, and the existing building affects the work in ways that only a survey can reveal.

Consider two 1 kanal houses in DHA. In the first, the owner wants new paint, new light fittings and polished floors. In the second, the owner wants to remove walls, rebuild the kitchen, replace all bathrooms, rewire the house and change the front elevation. Both are “remodeling”, but their costs per square foot are not remotely comparable.

That is why ACCO does not quote a flat remodeling rate. The house is surveyed, the scope is agreed, and every item is priced in a bill of quantities. Our related guide on how DHA construction rates are worked out explains the same principle for new houses.

Types of Remodeling Work in DHA Homes

Cosmetic refresh

Paint, minor repairs, new light fittings, polishing or replacing selected floors. The lightest scope.

Room remodels

Kitchens and bathrooms rebuilt with new fixtures, tiles, cabinets and services. Cost is concentrated in small areas.

Full interior renovation

New floors, ceilings, doors, wardrobes, electrical and plumbing throughout the house.

Structural and layout changes

Removing or moving walls, enlarging openings, adding rooms or floors. Needs engineering and possibly approval.

Exterior and elevation work

Front elevation changes, cladding, new windows, boundary walls, gates, landscaping and roof waterproofing. Elevation changes in DHA should respect the authority’s building regulations; see our guide to front elevation design in DHA Lahore.

What Drives Remodeling Cost per Sq Ft

1. Scope and demolition

The more that is removed, the more that must be rebuilt. Demolition itself has a cost, including debris removal, and often reveals hidden problems such as damp, corroded pipes or weak lintels.

2. Kitchens and bathrooms

These are the most expensive rooms per square foot because they combine plumbing, drainage, waterproofing, tiling, fixtures, cabinets and appliances in a small space. A house with several bathrooms being remodelled will have a much higher average rate.

3. Electrical and plumbing replacement

Older DHA houses may have wiring and pipes that are near the end of their life. Replacing them means opening walls and floors, then refinishing. It is far cheaper to do this during a renovation than afterwards.

4. Finish grade

The same room can be finished with local tiles and standard fittings or with imported porcelain, premium sanitaryware and custom joinery. Finish grade is usually the single largest variable the owner controls. Our DHA finishing cost breakdown explains how finishes are priced.

5. Structural work

Removing load-bearing walls, adding beams, strengthening slabs or adding a floor require structural design and careful execution. These items can change the budget significantly and must never be done without an engineer’s check.

6. Access and working conditions

Whether the family stays in the house during work, how materials reach upper floors, and restrictions on working hours in the society all affect labour time and cost.

7. Market rates

Prices of steel, cement, tiles, copper wire and imported fittings move during the year. A BOQ fixes quantities, and rates are confirmed at the time of contract.

Remodeling Scope Comparison

ScopeRelative cost per sq ftTypical itemsApproval likely?
Cosmetic refreshLowestPaint, lights, minor repairsUsually no
Kitchen remodelHighCabinets, worktops, tiles, plumbing, electricalUsually no
Bathroom remodelHighWaterproofing, tiles, sanitaryware, plumbingUsually no
Full interior renovationMedium to highFloors, ceilings, doors, wiring, plumbingDepends on changes
Structural and additionsHighestBeams, slabs, new rooms or floorsUsually yes

How ACCO Prices a Remodel: The BOQ Method

A bill of quantities lists every item of work with its quantity, unit and rate. For a remodel, it typically includes sections for:

  • Demolition and debris removal
  • Structural repairs or alterations
  • Masonry, plaster and waterproofing
  • Electrical wiring, boards, sockets and lighting
  • Plumbing, drainage and sanitaryware
  • Flooring, wall tiles and skirting
  • False ceilings and paint
  • Doors, windows, wardrobes and kitchen cabinets
  • Exterior, elevation and roofing

With a BOQ, the owner can see exactly what each part costs, change the finish grade item by item, and compare contractors fairly. It also protects against vague lump-sum quotes that later grow through variations. For material quantities and grades, see our DHA building material cost guide.

Survey

Inspect structure, services, damp and existing finishes.

Scope and design

Agree changes, layouts, finishes and drawings.

Itemised BOQ

Quantities and rates for every item, with options.

Execution

Phased work, quality checks and handover.

Approvals for Remodeling in DHA Lahore

Not every renovation needs approval. Internal finishes, kitchens and bathrooms usually do not. However, structural alterations, additional floors or rooms, changes to the covered area, and some elevation changes are regulated by DHA. Owners should confirm requirements with DHA Lahore before starting, as unapproved work can cause problems when selling the property or obtaining completion certificates. If electrical load is increasing significantly, a revised connection from LESCO may also be needed.

Ways to Control Remodeling Cost

  • Fix the scope and design before work starts; changes during work are the biggest cause of overruns
  • Prioritise kitchens, bathrooms and services, which are hardest to redo later
  • Keep the existing layout where it works, especially plumbing positions
  • Mix finish grades: premium where seen most, standard elsewhere
  • Replace old wiring and pipes while walls are open
  • Use one contractor for design and execution to avoid coordination gaps
  • Keep a contingency for hidden defects found during demolition

Remodel or Rebuild?

For some older DHA houses, the question is whether to remodel or demolish and rebuild. A rebuild may make sense when the structure has serious defects, the layout no longer suits the family, or the planned changes are so extensive that little of the original house would remain. Remodeling usually makes sense when the structure is sound and the layout largely works. A structural survey and a comparison of both BOQs give a clear answer. For new houses, see ACCO’s house construction in Lahore service and our society cost comparison.

Questions to ask before deciding

  • Is the structure sound, and are there signs of settlement, cracking or persistent damp?
  • How much of the existing layout will survive the planned changes?
  • Are the electrical, plumbing and drainage systems near the end of their life?
  • Does the family need to live in the house during the work?
  • Would a rebuild allow better use of the permitted covered area?

Answering these honestly, with an engineer’s survey, prevents the common mistake of spending heavily on a remodel only to find that a rebuild would have given a better house for a similar budget.

Living in the House During Renovation

Many DHA families stay at home while work is carried out. This is possible with careful phasing, for example completing one floor or wing at a time, but it slows the work and needs extra protection against dust and noise. Moving out for the main demolition and services phase usually shortens the programme and improves quality, especially when kitchens, bathrooms and wiring are being replaced across the house.

Frequently Asked Questions

What is the remodeling cost per sq ft in DHA Lahore?

There is no single reliable rate, because remodeling scopes vary widely. ACCO surveys the house, agrees the scope and prices it through an itemised BOQ so the owner sees the actual cost of every item.

Which rooms cost the most to remodel?

Kitchens and bathrooms, because they combine plumbing, waterproofing, tiling, fixtures and cabinetry in a small area.

Do I need DHA approval to renovate my house?

Internal finishes usually do not need approval, but structural changes, additions and some elevation changes are regulated. Check with DHA before starting.

Should I replace wiring during a remodel?

If the wiring is old or overloaded, yes. Replacing it while walls and ceilings are open is far cheaper and less disruptive than doing it later.

Is it cheaper to remodel or rebuild?

It depends on the condition of the structure and the extent of changes. A structural survey and comparison of both options provide the answer.

Does ACCO offer renovation in DHA Lahore?

Yes. ACCO provides survey, design, BOQ and execution for home remodeling in DHA and other Lahore societies; see our services.

Conclusion

Remodeling cost per sq ft in DHA Lahore depends almost entirely on what is being remodelled and to what standard. Rather than relying on a headline rate, homeowners get a dependable budget by surveying the house, fixing the scope and pricing it through an itemised BOQ. That approach makes it easy to adjust finishes, control variations and complete the renovation without surprises.

Contact ACCO

Planning a Project with ACCO?

Architecture, engineering and construction from one Lahore team since 1998. Design drawings are free when ACCO is awarded the construction.

Discuss Your ProjectWhatsApp +92 322 8000190

Tanveer Ahmed is the CEO of Ahmed Construction Company (ACCO), a Lahore-based architecture, engineering and construction firm operating since 1998. He has led ACCO since 2005, delivering hospital projects such as LDMC, MCH Islamkot and work at King Edward Medical University / Mayo Hospital and UOL Hospital Lahore, along with residential construction in DHA and Bahria Town, commercial buildings, MEP systems and turnkey projects across Pakistan.

WhatsApp