Quick contact info

Welcome to Ahmed Construction Company – your partner for innovative and high-quality construction. From residential to commercial projects, we turn dreams into reality with precision and reliability. Building a future of excellence, one project at a time.

icon_widget_image Monday-Friday: 9am to 5pm; Satuday: 10am to 2pm icon_widget_image Office 2, 3rd Floor, Bigcity Plaza, icon_widget_image + (92) 322-800-0190 + (923) 111-749-849 icon_widget_image info@acco.com.pk ahmed@acco.com.pk

ACCO PAKISTAN

Architecture Design and Construction Services Lahore

4 Marla House Construction Cost Lahore Pakistan

Architecture Design and Construction Services Lahore
Architecture Design and Construction Services Lahore

4 Marla House Construction Cost Lahore Pakistan

Total Cost
83.48 Lakh
Grey Structure Material Cost
36.95 Lakh
Finishing Material Cost
38.51 Lakh
Labour Cost
8.02 Lakh
Price Per Sq Ft
5,153

Breakdown of Overall Construction Cost By Percentage (PKR)

 
  • Foundation & Structure37.18 Lakh
  • Plumbing Works6.3 Lakh
  • Electrical Works8.5 Lakh
  • Wood, Metal and Tile Works26.65 Lakh
  • Fittings & Fixtures4.85 Lakh

Foundation & Structure

Foundation & Structure includes materials for the basic house structure including foundation, floors, walls, roofing, and plastering.

37.18 Lakh

Bricks, Cement, Sand, & Crush

21.44 Lakh
ITEM RATE QUANTITY COST
Bricks + Rorhi 26/Unit 45010 1,170,260
Cement 1150/Bag 484 556,600
Sand 87/Cft. 2420 210,540
Crush 150/Cft. 1377 206,550

Roof Insulation, Termite & Water Proofing

49.27 Thousand
ITEM RATE QUANTITY COST
Roof Insulation 249/Sft. 117 29,133
Termite Proofing 1700/Liter 4 6,800
Water Proofing 114/Sft. 117 13,338

Excavation & Steel Reinforcement

8.69 Lakh
ITEM RATE QUANTITY COST
Excavation & Backfill + Ghassu 25/Cft. 2957 73,925
Steel Reinforcement 265000/Tonne 3 795,000

Plumbing Works

Plumbing works include underground piping and drainage systems materials.

6.30 Lakh

Cold and Hot Water Supply

41.04 Thousand
ITEM RATE QUANTITY COST
25 mm o/d Pipe 107/Rft. 162 17,334
32 mm o/d Pipe 175/Rft. 65 11,375
40 mm o/d Pipe 268/Rft. 16 4,288
50 mm o/d Pipe 402/Rft. 20 8,040

Insulation Armaflex

26.76 Thousand
ITEM RATE QUANTITY COST
32 mm o/d 452/Rft. 32 14,464
50 mm o/d 615/Rft. 20 12,300

Drainage System Piping

85.6 Thousand
ITEM RATE QUANTITY COST
2″ Dia. Pipe 265/Rft. 65 17,225
3″ Dia. Pipe 355/Rft. 65 23,075
4″ Dia. Pipe 467/Rft. 97 45,299

Gas Piping

53.42 Thousand
ITEM RATE QUANTITY COST
GI Welded Pipeline 3/4” i/d 416/Rft. 122 50,752
Gas Cock 3/4″ i/d 1335/Unit 2 2,670

Pumps and Drains

3.11 Lakh
ITEM RATE QUANTITY COST
Booster Pump 0.75 HP 155000/Unit 1 155,000
Submersible Water Transfer Pump 1 HP 145500/Unit 1 145,500
Floor Drains 1710/Unit 6 10,260

AC Drainage System

11.99 Thousand
ITEM RATE QUANTITY COST
1″ dia Class “E” 110/Rft. 109 11,990

UPVC Pipeline for Sewerage System

29.27 Thousand
ITEM RATE QUANTITY COST
6″ dia Class “B” 714/Rft. 41 29,274

Electrical Works

Electrical works include underground wiring and all electrical items.

8.50 Lakh

 
Grey Structure 1.26 Lakh
Finishing 7.23 Lakh

Switches and Back Boxes

1.9 Lakh
ITEM RATE QUANTITY COST
Power Sockets 1475/Socket 12 17,700
Fan Dimmer 1240/Dimmer 8 9,920
Universal Switch Socket 625/Socket 24 15,000
Telephone Sockets (RJ-11) 595/Socket 2 1,190
Distribution Board 110741/Unit 1 110,741
TV Sockets 495/Socket 5 2,475
Switch Boards 1390/Board 24 33,360

Conduits & Accessories

41.15 Thousand
ITEM RATE QUANTITY COST
3/4” dia. Electrical PVC Conduit with accessories 30/Rft. 810 24,300
1” dia. Electrical PVC Conduit with accessories 31/Rft. 243 7,533
1.5” dia. Electrical PVC Conduit with accessories 41/Rft. 28 1,148
2” dia. Electrical PVC Conduit with accessories 50/Rft. 32 1,600
PVC Ceiling Fan Hook 547/Unit 12 6,564

Wires & Cables

3.16 Lakh
ITEM RATE QUANTITY COST
1.5mm Sq. (3/.029) PVC insulated Cu.conductor wire (Light point wiring) 4944/Coil 8 39,552
2.5mm Sq. (7/.029)PVC insulated Cu. conductor wire “Circuit wiring (Normal & UPS) & sockets Split AC 7931/Coil 8 63,448
4mm Sq. PVC insulated Cu. Conductor wire (Power Sockets wiring) Split AC 12360/Coil 4 49,440
Four core 16 mm Sq. PVC insulated Cu. conductor cable (From DB-GF to wapda Energy Meter) 1494/Rft. 70 104,580
Cat 5 for Telephone Cable 376/Rft. 41 15,416
TV Coaxial Cable for TV cable 357/Rft. 122 43,554

Lights, Fans and Chandeliers

2.28 Lakh
ITEM RATE QUANTITY COST
Boundary Wall lights 1692/Light 2 3,384
Porch Lights 1692/Light 4 6,768
Bedroom Lights 1330/Light 12 15,960
Bathroom Lights 1330/Light 8 10,640
Open Area Lights 1330/Light 8 10,640
Kitchen Lights 3500/Light 8 28,000
Stair Case Lights 1400/Light 6 8,400
Drawing Room Lights 3928/Light 4 15,712
Living Area Lights 3928/Light 8 31,424
Ceiling Fans 8700/Fan 8 69,600
Exhaust Fans 4500/Fan 6 27,000

Wood, Metal and Tile Works

Wood, Metal & Tile Works include cabinets, wardrobes, flooring, and all aluminum and iron works.

26.65 Lakh

Paint and Ceiling Works

4.6 Lakh
ITEM RATE QUANTITY COST
False Ceiling 140/Sft. 486 68,040
Paint 57/Sft. 6885 392,445

Tile Work

8.68 Lakh
ITEM RATE QUANTITY COST
Floor Tiles 310/Sft. 1712 530,720
Floor Skirting 271/Sft. 598 162,058
Ceramic Tiles on Walls & Dado 289/Sft. 608 175,712

Wooden Doors

4.99 Lakh
ITEM RATE QUANTITY COST
Main Entrance Door 101701/Door 1 101,701
Room Doors 38420/Door 4 153,680
Washroom and Other Doors 27120/Door 6 162,720
Roof and Terrace Doors 27120/Door 3 81,360

Windows

1.76 Lakh
ITEM RATE QUANTITY COST
Aluminium Room Windows 20340/Window 6 122,040
Aluminium Bathroom Windows 13560/Window 4 54,240

Metal Works

2.13 Lakh
ITEM RATE QUANTITY COST
Staircase and Terrace Railing 1605/Rft. 48 77,040
Main Gate 135602/Unit 1 135,602

Wardrobes & Cabinets

4.48 Lakh
ITEM RATE QUANTITY COST
Wardrobes 77632/Unit 3 232,896
Kitchen Cabinets 107351/Unit 2 214,702

Fittings & Fixtures

Fittings & Fixtures include kitchen and bath accessories.

4.85 Lakh

Kitchen

56.1 Thousand
ITEM RATE QUANTITY COST
Kitchen Sink 13500/Sink 2 27,000
Sink Mixer 11300/Mixer 2 22,600
Gully Trap Chamber 3249/Unit 2 6,498

Bathroom

3.86 Lakh
ITEM RATE QUANTITY COST
Water Closet 21696/Unit 4 86,784
Vanity Basin 13575/Basin 4 54,300
Basin Mixer 12200/Mixer 4 48,800
Muslim Shower 2830/Unit 4 11,320
Shower Set 36160/Unit 4 144,640
Toilet Paper Holder 1356/Unit 4 5,424
Beveled Edge Mirror 7040/Mirror 4 28,160
Soap Dish 1083/Dish 6 6,498

Geyser & Manhole

43.39 Thousand
ITEM RATE QUANTITY COST
Geyser 32500/Unit 1 32,500
Manhole 5445/Unit 2 10,890
  1. #HouseConstructionCost
  2. #4MarlaHouse
  3. #LahoreProperty
  4. #HomeBuilding
  5. #ConstructionEstimates
  6. #BudgetHome
  7. #RealEstateLahore
  8. #HomeRenovation
  9. #InteriorDesign
  10. #AffordableHousing
  11. #ConstructionTips
  12. #PropertyInvestment
  13. #PakistanRealEstate
  14. #BuildingMaterials
  15. #HomeDesignIdeas
  16. #CostEstimation
  17. #LahoreBuilders
  18. #DreamHomeCost
  19. #HousingMarket
  20. #ConstructionQuotes
  21. #4MarlaHouseConstructionCost
  22. #HouseConstructionLahore
  23. #ConstructionBudget
  24. #LahoreProperty
  25. #HomeConstruction
  26. #BuildingCosts
  27. #ConstructionMaterials
  28. #ConstructionEstimate
  29. #HouseDesign
  30. #ConstructionTips
  31. #LahoreRealEstate
  32. #BudgetHome
  33. #HouseConstructionPlan
  34. #ConstructionContractors
  35. #CostBreakdown
  36. #HomeBuildingProcess
  37. #LahoreHousing
  38. #ConstructionTimeline
  39. #4MarlaHouseDesign
  40. #ConstructionCostCalculator
  41. #4MarlaHouseConstructionCost
  42. #HouseConstructionLahore
  43. #ConstructionBudget
  44. #LahoreProperty
  45. #HomeConstruction
  46. #BuildingCosts
  47. #ConstructionMaterials
  48. #ConstructionEstimate
  49. #HouseDesign
  50. #ConstructionTips
  51. #LahoreRealEstate
  52. #BudgetHome
  53. #HouseConstructionPlan
  54. #ConstructionContractors
  55. #CostBreakdown
  56. #HomeBuildingProcess
  57. #LahoreHousing
  58. #ConstructionTimeline
  59. #4MarlaHouseDesign
  60. #ConstructionCostCalculator