
Taipei Performing Arts Center by OMA, Taipei: Design Review
By Tanveer Ahmed, CEO, Ahmed Construction Company (ACCO) · Updated · Reviewed by ACCO architects and engineers
Quick Answer
Taipei Performing Arts Center by OMA: a design review of its central cube, three theatres and Public Loop, with practical lessons for Pakistan. Ahmed Construction Company (ACCO), based in Gulberg-III Lahore since 1998, provides ACCO design & construction services with design drawings free on award of construction.
The Taipei Performing Arts Center by OMA is one of the most unusual theatre buildings completed in recent years. Located beside the busy Shilin Night Market in Taipei, Taiwan, it was designed by OMA with partners in charge Rem Koolhaas and David Gianotten, and completed in 2022 with Kris Yao | Artech as architect of record. Instead of the usual arrangement of separate auditoria hidden behind a formal front, it plugs three theatres into a central cube and runs a public route straight through the building. This design review explains how the Taipei Performing Arts Center works, what is innovative about it, its practical challenges, and what lessons it holds for cultural and public buildings in Pakistan.
Taipei Performing Arts Center at a Glance
| Architect | OMA (partners in charge Rem Koolhaas and David Gianotten; project director Chiaju Lin) |
|---|---|
| Architect of record | Kris Yao | Artech |
| Location | Shilin District, Taipei, Taiwan, beside the Shilin Night Market |
| Completed | 2022 (design development 2009 to 2013) |
| Gross area | About 58,658 m² (published project data) |
| Theatres | Grand Theater (about 1,500 seats), Globe Playhouse (about 800 seats), Blue Box (about 800 seats) |
| Key ideas | Central cube shared by all theatres, combinable stages (“Super Theater”), and a Public Loop through the backstage world |
The Design Question OMA Set Out to Answer
Many modern performing arts centres follow a standard formula: a large auditorium, a medium auditorium and a black box, each with its own stage and support areas, wrapped in an impressive façade. The model works, but it tends to separate theatre from daily city life. People go in only when they hold a ticket, and the buildings are often quiet during the day.
OMA asked whether a public theatre could still be inclusive, mixing high art and popular events, planned shows and spontaneous ones, audiences and passers-by. The site made the question sharper. Shilin Night Market is one of the liveliest street environments in Taipei, and a closed, formal building would have turned its back on that energy.
Architecture and Massing: A Cube with Three Theatres
The building is organised around a central cube that holds the stages, backstage areas, support rooms and shared audience spaces for all three theatres. The auditoria are attached to the cube on different sides, so each one reads as a separate object projecting from the core. The cube is clad in corrugated glass, which glows at night and shows the activity inside.
The result has no single front or back. Each side of the building presents a different face, defined by the theatre that projects from it. Beneath one of the elevated volumes, a plaza provides a covered public space that the architects describe as a second stage for the city.
Grand Theater
About 1,500 seats, with a slightly asymmetrical shape that departs from the traditional shoebox, suitable for a wide range of performing arts.
Globe Playhouse
About 800 seats in a spherical volume with inner and outer shells; its intersection with the cube forms an unusual proscenium for experimenting with stage framing.
Blue Box
About 800 seats, intended for the most experimental productions, and located on the same level as the Grand Theater.
Super Theater
When the Grand Theater and Blue Box stages are joined, they form one very large, factory-like space for productions that would not fit a normal stage.
Flexibility: Combining and Reconfiguring Stages
The most important technical idea in the Taipei Performing Arts Center is shared stage infrastructure. Because the stages meet in the central cube, they can be used separately or coupled together. This creates layouts that are rarely available in a conventional theatre, and it allows directors to use the building itself as part of a production.
Why it matters
- Range of productions. The same building can host intimate experimental work and very large-scale shows.
- Efficiency of support space. Loading, workshops and backstage functions can be shared rather than duplicated.
- Future-proofing. Performance formats change over decades; a flexible core can adapt to new ones.
The trade-offs
- Sharing stages requires careful scheduling and acoustic separation so that one theatre does not disturb another.
- Complex stage machinery and combinable spaces raise construction cost and demand skilled operating staff.
- Fire, smoke and life-safety design become more complicated when large volumes can be joined.
The Public Loop: Opening the Backstage to the City
The Public Loop is a route that takes visitors, with or without a ticket, through the building’s infrastructure and normally hidden production spaces. Portal windows along the route give views into technical areas and between the theatres. In this way, the “machine” of theatre becomes something the public can see and understand.
This idea links the building to the night market outside. People who come for food and shopping can wander into the building, see what is going on, and perhaps return for a performance. It turns a cultural institution into part of the daily street life of the neighbourhood rather than a destination reserved for special occasions.
Comparison: Conventional Arts Centre vs Taipei Performing Arts Center
| Factor | Conventional arts centre | Taipei Performing Arts Center |
|---|---|---|
| Plan | Separate auditoria, each with its own stage | Three auditoria plugged into a shared central cube |
| Public access | Mainly ticket holders, foyer only | Public Loop through production areas for anyone |
| Stage flexibility | Fixed stages | Stages can be combined into a Super Theater |
| Relationship to street | Formal front façade and entrance plaza | Many faces, covered plaza as a public stage |
| Operational complexity | Moderate | High, needing coordinated scheduling and skilled staff |
Engineering and Building Services Considerations
Any building of this kind is as much an engineering project as an architectural one. Cantilevered auditoria require heavy structural transfer systems; theatres need high levels of acoustic isolation from each other and from street noise; and large assembly spaces demand robust ventilation and fire engineering. Taiwan is also seismically active, so the structure and the heavy stage equipment must be designed for earthquake loads.
Key systems in large performance buildings
- Acoustics: box-in-box construction, isolated floors and sound locks between theatres and public areas
- HVAC: low-velocity, low-noise air distribution for large audiences, designed with reference to ASHRAE standards
- Fire and life safety: smoke control over stages, fire curtains, compartmentation and protected escape routes following NFPA principles
- Stage engineering: fly towers, lifts and rigging integrated with structure from the start
Lessons for Pakistan
Pakistan has a long tradition of music, theatre and public gatherings, but relatively few purpose-built modern performance venues. Arts councils, universities and private developers are increasingly interested in auditoria, halls and multi-use cultural spaces. The Taipei Performing Arts Center offers useful ideas, even at a smaller scale.
Connect cultural buildings to street life
Many Pakistani auditoria sit behind boundary walls and are closed outside event times. A shaded public plaza, a café or a visible foyer facing a busy street can bring people in daily, in the same spirit as the Public Loop. In a hot climate such as Lahore’s, that public space should be shaded and well ventilated, with seating that is usable in summer evenings.
Plan for flexible, multi-use halls
Few Pakistani clients can afford three separate theatres. A more realistic lesson is to design one main hall and one smaller studio that can share backstage facilities, loading and services, and to allow seating and stage layouts to change. This suits universities, schools and commercial complexes that host conferences, performances and exhibitions.
Take seismic and fire design seriously
Large-span assembly buildings with many occupants must be designed to the Building Code of Pakistan, including its seismic provisions, and need well-planned fire exits, smoke management and emergency lighting. These items are often under-designed in local auditoria and should be fixed at concept stage, not after construction.
Budget honestly for acoustics and services
Acoustic isolation, quiet HVAC and stage equipment can represent a significant share of an auditorium budget. ACCO prices such work through an itemised BOQ; the commercial construction rates guide explains how rates are built up. For larger public and cultural buildings, see ACCO’s institutional projects and commercial building construction in Lahore.
How a Performance Venue Project Typically Develops
Brief and use study
Define the types of events, audience sizes, operating model and how the public will use the building outside performances.
Concept and specialists
Develop the architecture with acoustic, theatre, structural, fire and MEP consultants working together early.
Approvals and BOQ
Secure building approvals and prepare a detailed, itemised BOQ including stage and acoustic packages.
Build, test and commission
Construct, tune the acoustics, test stage systems and life-safety equipment, and train operators.
For another arts building reviewed on our blog, see Henning Larsen’s Kontrapunkt Arts Center in Bergen. Details of ACCO’s design and construction work are on our services page.
Frequently Asked Questions
Who designed the Taipei Performing Arts Center?
The Taipei Performing Arts Center was designed by OMA, with Rem Koolhaas and David Gianotten as partners in charge. Kris Yao | Artech was the architect of record in Taiwan.
When was the Taipei Performing Arts Center completed?
The building was completed in 2022. OMA’s design development phase ran from 2009 to 2013, and construction followed over several years.
How many theatres does it have?
It has three: the Grand Theater with about 1,500 seats, and the Globe Playhouse and Blue Box with about 800 seats each. The Grand Theater and Blue Box can be combined into a larger Super Theater.
What is the Public Loop?
The Public Loop is a route open to visitors without tickets that passes through the building’s production infrastructure, with windows into technical spaces and between theatres.
Why is the building located near Shilin Night Market?
The site is in a busy, popular part of Taipei. OMA used this location to connect the theatre to everyday street life, bringing passers-by into the building rather than separating culture from the city.
Can similar ideas be used for auditoria in Pakistan?
Yes, at an appropriate scale. Shared backstage areas, flexible halls and public spaces connected to the street are realistic for universities, arts councils and commercial developments, provided seismic, fire and acoustic design are handled properly.
Conclusion
The Taipei Performing Arts Center by OMA challenges the standard model of a theatre complex by sharing stages, combining spaces and opening the backstage world to the public. Its complexity comes with real costs in engineering and operation, but its central idea is widely relevant: cultural buildings work best when they are flexible and part of daily city life. For Pakistan, the lesson is to plan auditoria and cultural spaces that invite the public in, adapt to many uses, and are engineered properly for earthquakes, fire and acoustics.
Related articles
ACCO services
Contact ACCO
- +92 322 8000190
- info@acco.com.pk
- Office 2, 3rd Floor, Bigcity Plaza, Gulberg-III, Lahore
Planning a Project with ACCO?
Architecture, engineering and construction from one Lahore team since 1998. Design drawings are free when ACCO is awarded the construction.
Discuss Your ProjectWhatsApp +92 322 8000190