ACCO – Ahmed Construction Company · Updated 14 October 2026 · Reviewed by ACCO architects and engineers
DHA Commercial Plaza – ACCO
Commercial Plaza Construction in DHA Lahore
Commercial plaza design, architectural drawings, structural engineering, MEP, DHA approvals, grey structure, façade, finishing and turnkey project management across DHA Lahore Phase 1 to Phase 13 and Phase 9 Prism – one team, one contract.


Quick Answer
ACCO (Ahmed Construction Company) provides commercial plaza construction in DHA Lahore across Phase 1 to Phase 13 and Phase 9 Prism: feasibility under DHA regulations, architectural drawings, 3D elevation, structural and MEP design, DHA approvals, grey structure, glass and aluminium façades, finishing and turnkey project management. Indicative 2026-27 Lahore rates are PKR 3,600–4,300 per sq ft for commercial grey structure with basement, PKR 2,300–6,600 per sq ft for finishing depending on grade and PKR 7,500–11,000 per sq ft for turnkey plaza construction. Design drawings are free when ACCO is awarded the construction. Call or WhatsApp 0322-8000190.
DHA Commercial Plazas with ACCO at a Glance
| Company | Ahmed Construction Company (ACCO), architecture, engineering and construction, Lahore |
|---|---|
| Operating since | 1998 |
| DHA areas served | DHA Lahore Phase 1, 2, 3, 4, 5, 6, 7, 8, 9 (Town), 9 Prism, 10, 11 (Rahbar), 12 (EME) and 13 |
| Building types | Commercial plazas, shops, offices, banks, showrooms, mixed-use buildings, commercial complexes |
| Design scope | Feasibility under DHA regulations, floor plans, 3D elevation, façade, architectural, structural, MEP, fire safety, parking and approval drawings, BOQ |
| Construction scope | Basements, grey structure, glass and aluminium, MEP, lifts, finishing, renovation, turnkey handover |
| Grey structure (2026-27) | PKR 3,600–4,300 per sq ft with basement |
| Finishing (2026-27) | PKR 2,300–3,300 budget; 3,300–4,600 standard; 4,600–6,600 premium glass-façade |
| Turnkey (2026-27) | PKR 7,500–11,000 per sq ft |
| Typical timeline | Design and approvals 3–6 months; a 4–10 storey plaza 18–30 months to build |
| Design fee | Free on award of construction; design-only quoted separately |
| Contact | 0322-8000190 · info@acco.com.pk · www.acco.com.pk |
Commercial Plaza Construction in DHA Lahore
Commercial plaza construction in DHA by ACCO covers excavation and shoring, basements and waterproofing, RCC frame, masonry, façade, lifts, MEP and fire systems, finishing and handover. Concrete is cube-tested, steel is Grade 60, and every pour is checked by an engineer, with weekly progress reports for owners and investors.
Commercial Plaza Design in DHA Lahore
DHA Lahore (Defence Housing Authority) is Lahore’s largest planned community, with commercial areas in every phase from Phase 1 to Phase 13 and DHA Phase 9 Prism. DHA commercial plots are among the most sought-after retail and office addresses in the city, and DHA enforces its own building regulations, inspections and completion process. A commercial plaza in DHA Lahore therefore has to meet DHA’s rules, attract quality tenants and buyers, and justify premium land values with an efficient, well-built design.
ACCO’s commercial plaza design in DHA Lahore starts with a feasibility study for your plot: permissible covered area, height, setbacks, basements and parking under DHA regulations, then a comparison of options such as all-retail, retail with offices, or a banking or flagship ground floor with offices above, so the design you approve is the one that pays back best.
Commercial Plaza Construction Across All DHA Lahore Phases
ACCO provides commercial plaza design, construction, finishing and renovation in every DHA Lahore phase. Commercial rules can differ by plot, road width and location, so ACCO confirms the current position with DHA Building Control for each plot before design is frozen.
Commercial Plaza Construction in DHA Phase 1 Lahore
One of DHA Lahore's oldest phases, with established commercial areas. Most plaza work here is redevelopment, renovation and façade upgrades, where shoring next to existing buildings and working around trading neighbours need care.
Commercial Plaza Construction in DHA Phase 2 Lahore
An established phase with mature commercial areas. Typical projects are replacing older buildings with modern plazas and upgrading lobbies, lifts, toilets and fire safety.
Commercial Plaza Construction in DHA Phase 3 Lahore
A busy, established phase with well-known commercial areas and strong retail and food demand. New plazas focus on frontage, signage and efficient basements; renovations focus on façades and services.
Commercial Plaza Construction in DHA Phase 4 Lahore
An established phase with commercial areas serving offices, clinics and retail. Floor plans that can be leased as offices or shops add flexibility.
Commercial Plaza Construction in DHA Phase 5 Lahore
A mature, well-populated phase where retail and office space are in steady demand. Plazas here benefit from premium façades and well-planned parking.
Commercial Plaza Construction in DHA Phase 6 Lahore
Home to major commercial addresses including Main Boulevard, CCA and Broadway commercial areas, with larger and taller plazas, deep basements and corporate and flagship retail tenants.
Commercial Plaza Construction in DHA Phase 7 Lahore
A developing phase that includes larger commercial and high-rise commercial sites. Feasibility on height approval, parking demand and deep excavation comes first.
Commercial Plaza Construction in DHA Phase 8 Lahore
Includes Broadway Commercial and Park View Commercial, popular for corporate offices, banks and flagship retail, where glass façades and high-spec MEP are common.
Commercial Plaza Construction in DHA Phase 9 Lahore
DHA Phase 9 (Town) is a compact phase with smaller commercial plots, where shop sizes, stairs and a single efficient core decide how much area can be sold or leased.
Commercial Plaza Construction in DHA Phase 9 Prism Lahore
DHA Phase 9 Prism is a newer phase with a large number of commercial plots and active new-build plaza construction. Soil, plot levels and utility access are checked before foundation design.
Commercial Plaza Construction in DHA Phase 10 Lahore
A developing phase. Possession, demarcation and infrastructure status are confirmed with DHA before design and construction are scheduled.
Commercial Plaza Construction in DHA Phase 11 Lahore
DHA Phase 11 (Rahbar) is a newer phase with commercial areas serving its growing resident base. Practical, cost-efficient plaza designs with good parking suit demand here.
Commercial Plaza Construction in DHA Phase 12 Lahore
DHA Phase 12 (EME) has commercial areas serving its residential sectors. Plazas are planned around local retail, clinics, offices and food outlets.
Commercial Plaza Construction in DHA Phase 13 Lahore
The newest DHA Lahore phase. ACCO confirms possession, demarcation, levels and infrastructure availability with DHA before committing to design and programme.
Phase notes are general guidance, not a statement of DHA rules for any specific plot. For phase-by-phase residential information, see our DHA Lahore phases construction guide.
Best Construction Company for DHA Commercial Projects
The best construction company for DHA commercial projects is a design-and-build firm that knows DHA’s approval and inspection process and can prove its quality. ACCO’s architects, structural and MEP engineers, quantity surveyors and site teams work under one contract, and we build across DHA Lahore phases. Look for built work you can visit, an itemised BOQ, milestone payments, daily engineer supervision and a written warranty: ACCO provides all of these in writing before you sign.
Commercial Plaza Architects in DHA Lahore
Our commercial plaza architects in DHA Lahore design around frontage, shop depth, circulation and core placement. They work alongside our structural and MEP engineers from day one, so a striking plaza is also buildable, approvable and efficient to run. See architectural design services in Lahore.
Commercial Building Design in DHA Lahore
Commercial building design in DHA also includes office blocks, showrooms, clinics, schools, restaurants and mixed-use buildings. Each type has its own design driver: footfall and visibility for retail, floor-plate efficiency for offices, and separate cores and entrances for mixed-use. See our commercial building design service.
DHA Commercial Plaza Grey Structure Contractor
Commercial plaza grey structure work by ACCO, as a specialist grey structure contractor, includes excavation, shoring and dewatering, foundations, basement walls and waterproofing, RCC columns, beams and slabs, staircases, lift shafts, masonry and concealed service sleeves. Indicative 2026-27 rate with basement: PKR 3,600–4,300 per sq ft.
Turnkey Commercial Plaza Construction in DHA
With turnkey commercial plaza construction, ACCO delivers the finished building: design, approvals, grey structure, façade, MEP, lifts, fire systems and finishing, with testing, commissioning, as-built drawings and the completion certificate. Indicative turnkey rate: PKR 7,500–11,000 per sq ft. See turnkey construction.
Commercial Plaza Architectural Drawings
Commercial plaza architectural drawings include the site plan, basement and floor plans, sections, elevations, staircase and lift details, shop-front and façade details, toilet and core layouts, finishing plans and door and window schedules. Complete working drawings let contractors price accurately and build without guesswork.


Commercial Plaza 3D Elevation Design in DHA
Commercial plaza 3D elevation design shows the building with real materials, signage zones and night lighting before construction starts. ACCO prepares several photorealistic options, which also help with pre-selling shops and offices and with financing. See 3D architectural walkthroughs.
Modern Commercial Plaza Architecture
Modern commercial plaza architecture uses clean glazed frontages, ACP or stone cladding, vertical fins for shading, integrated signage bands, LED façade lighting and open, well-lit lobbies, while keeping glazing and shading suited to Lahore’s hot summers.
Multi-Storey Commercial Plaza Construction
Multi-storey commercial plaza construction stacks shops on lower floors and offices or apartments above, with the core, lifts, fire stairs and service risers placed to maximise saleable area on every level. Structural design accounts for wind and seismic loads, deeper basements and transfer beams where uses change between floors. See high-rise building design.
Commercial Plaza Floor Plan Design
Good commercial plaza floor plan design keeps corridors short, shops deep enough to trade, columns out of shop fronts, toilets and services grouped at the core, and lettable or saleable efficiency high. ACCO tests several floor plans against your sales or rental targets before freezing the design.
Commercial Plaza Structural Design
Commercial plaza structural design covers soil investigation, foundation design (raft or isolated footings), basement retaining walls, column grid, beams and slabs, and seismic detailing. Drawings are signed by a PEC-registered structural engineer. See structural design services.
Commercial Plaza MEP Design Services
Commercial plaza MEP design services include electrical load and transformer sizing, distribution, lighting, backup generator, HVAC and ventilation, water supply, drainage, fire fighting and fire alarm systems, lifts, CCTV and structured cabling, coordinated in one model to avoid clashes. See MEP engineering.
Commercial Plaza Electrical & Plumbing Drawings
Commercial plaza electrical and plumbing drawings show separate meters and sub-distribution for each shop or office, common-area circuits, earthing, water storage and pumping, toilet layouts, drainage and rainwater lines, so tenants can be metered and billed fairly.
Commercial Plaza Interior Design in DHA
Commercial plaza interior design covers lobbies, corridors, lift lobbies, toilets, food courts and model shops or offices, with durable floors, false ceilings, wayfinding and lighting that make the building feel premium and easy to navigate. See interior design services.


Commercial Plaza Finishing Services in DHA Lahore
Commercial plaza finishing services in DHA include plaster, façade cladding and glazing, flooring, false ceilings, shop fronts, toilets, lift and stair finishes, electrical fittings, fire systems and paint, delivered as shell-and-core or fully finished units. See commercial plaza finishing services.
Commercial Plaza Facade & Elevation Design
Commercial plaza façade and elevation design balances visibility, signage, shading and cost. Options range from plaster and paint, ACP and stone cladding to framed glazing, curtain walls and structural glazing, each detailed for waterproofing, maintenance access and Lahore’s heat.
ACCO Commercial Plaza Design Concepts
A selection of ACCO façade and elevation design concepts for commercial plazas, showing glass and aluminium, ACP cladding, signage zones and lighting options we develop with clients. Every concept is adapted to the plot, DHA rules and budget.


















Commercial Plaza Glass & Aluminium Work
Commercial plaza glass and aluminium work covers shop fronts, windows, curtain walls, structural glazing, glass railings, entrance doors and ACP cladding. ACCO specifies the aluminium section, glass type (tempered, laminated or double-glazed) and sealing system and coordinates them with the structure.


Commercial Plaza Flooring & Ceiling Work
Commercial plaza flooring and ceiling work uses hard-wearing porcelain, granite or terrazzo in high-traffic areas, epoxy or concrete hardener in basements, and gypsum or acoustic tile false ceilings that keep services accessible for maintenance.
Commercial Shop Construction in DHA Lahore
Commercial shop construction in DHA includes individual shops, shop rows and fit-outs inside plazas: shop fronts, shutters, flooring, ceilings, lighting, display fixtures, AC and fire protection. See retail and showroom interiors.
Retail Shop Design in DHA
Retail shop design in DHA Lahore focuses on frontage width, display depth, clear height, signage, lighting and storage. Well-proportioned shops sell and rent faster, which is why shop sizes are fixed early in the plaza layout.
Commercial Office Building Construction
Commercial office building construction in DHA needs efficient floor plates, a flexible column grid, good daylight, cable management, central or VRF cooling and backup power. See office building architecture.
Commercial Complex Planning & Development
Commercial complex planning arranges several blocks or uses on a larger site: anchor stores, food courts, offices, parking, service yards and pedestrian routes, phased so early blocks can open and earn while later ones are built.
Commercial Plaza Parking Layout Design
Commercial plaza parking layout design meets the bylaw parking requirement with efficient bay and aisle geometry, ramps at workable slopes, clear headroom, ventilation and lighting. Parking is often what drives the number of basements, so it is planned at feasibility stage.


Commercial Plaza Fire Safety Planning
Commercial plaza fire safety planning covers escape stairs and travel distances, fire-rated compartments and doors, emergency lighting and signage, fire alarm and detection, hose reels, sprinklers where required, fire pumps and water storage, following building code and NFPA principles. See MEP and firefighting.
Commercial Plaza Approval Drawings
Commercial plaza approval drawings in DHA Lahore are prepared to the DHA Lahore Construction & Development Regulations: site plan, floor plans, sections, elevations, parking and fire safety layouts, with architectural drawings by a PCATP/DHA-registered architect and structural drawings signed by a PEC-registered engineer. On commercial plots, parking requirements calculated by use often decide the number of basements, and height on some commercial sites depends on location and may need DHA Executive Board approval. ACCO checks these at feasibility, submits the file, answers observations and manages stage inspections and the completion certificate. See DHA Lahore map approval and by-laws.
Commercial Plaza Cost Estimation
ACCO’s quantity surveyors provide commercial plaza cost estimation at every stage: a per-sq-ft budget at feasibility, an elemental estimate at concept, and an itemised BOQ with rate analysis from working drawings, so you know the cost before you commit.
Commercial Plaza Construction Cost in DHA Lahore
| Scope (2026-27, Lahore) | PKR per sq ft | What’s included |
|---|---|---|
| Grey structure with basement | 3,600 – 4,300 | Excavation, foundations, basement, RCC frame, masonry |
| Turnkey commercial plaza | 7,500 – 11,000 | Grey structure plus façade, lifts, MEP, fire systems, finishes |
| Premium mixed-use / mall-type | 10,000 – 16,000 | Atriums, escalators, central HVAC, smoke control |
| Architectural, structural & MEP design | Free on award of construction | Design-only quoted after reviewing plot and brief |
Example: a plaza with 6,000 sq ft of total covered area built turnkey at PKR 7,500–11,000 per sq ft would cost roughly PKR 4.5–6.6 crore, excluding land, approval fees and utility connections. The commercial plaza construction cost in DHA depends most on the number of basements, the façade, lifts and the finish grade.
Indicative rates for budgeting only; they move with steel, cement and labour prices. Every project is priced from a detailed BOQ. See also construction cost per sq ft in Lahore.
Commercial Plaza Finishing Cost per Square Foot
| Grade | Finishing & interior (PKR per sq ft) | Typical specification |
|---|---|---|
| Budget commercial | 2,300 – 3,300 | Plaster and paint or basic ACP, local tiles, basic lighting, tenant-installed AC |
| Standard commercial | 3,300 – 4,600 | ACP or stone façade, porcelain floors, false ceilings, lifts, fire alarm |
| Premium glass-façade | 4,600 – 6,600 | Curtain wall or structural glazing, granite, central or VRF cooling, full fire systems |
The commercial plaza finishing cost per square foot is added to grey structure cost and applies to covered area.
Commercial Property Development in DHA Lahore
For commercial property development in DHA Lahore, ACCO supports owners and investors from plot evaluation to sale or lease: feasibility and return comparison, design for maximum saleable and lettable area, DHA approvals, phased construction cash flow, 3D visuals for pre-selling shops and offices, and handover documents for buyers and tenants. Overseas owners receive weekly photo and video reports and milestone-based payments.
Commercial Plaza Renovation & Remodeling
Commercial plaza renovation and remodeling refreshes older buildings with new façades, lobbies, toilets, lifts, electrical upgrades and fire safety improvements, often while tenants keep trading. An engineer checks the structure first so every change is safe. See building renovation services.
Commercial Plaza Project Management
Commercial plaza project management protects budget and programme: scheduling, procurement, contractor coordination, cost control against the BOQ, quality and safety inspections, cash-flow forecasting and weekly reporting. See project management.
Commercial Plaza Construction Consultant in DHA
As a commercial plaza construction consultant, ACCO can also act for you on projects built by others: design review, BOQ and tender preparation, contractor selection, site supervision, quality testing and payment certification.
Commercial Plaza Contractor in DHA Lahore
A good commercial plaza contractor in DHA Lahore should show built plazas, an itemised BOQ, a written programme, milestone payments, daily engineer supervision and a written warranty. ACCO provides all of these in writing before you sign. See also our grey structure contractors in DHA Lahore.
Commercial Building Renovation in DHA
Commercial building renovation in DHA includes converting floors to new uses, upgrading shop fronts and façades, adding lifts or fire systems, and refitting offices and restaurants, with structural checks and revised approvals where needed.
Commercial Plaza Investment Building Design
Commercial plaza investment building design is about return: high saleable efficiency, shop and office sizes that match local demand, ground-floor frontage maximised, low running costs and a façade that holds value. We compare layout options on revenue versus construction cost before design is frozen.
Commercial Building Space Planning
Commercial building space planning divides floors into shops, offices or showrooms that can be combined or split as tenants change, with separate metering, flexible shop fronts and service points, and keeps cores and corridors compact so saleable and lettable area stays high.
Commercial Plaza Turnkey Finishing
Commercial plaza turnkey finishing takes a completed grey structure, whether built by ACCO or others, and delivers a ready-to-sell or ready-to-lease building: façade cladding and glazing, shop fronts, lobbies, flooring, false ceilings, toilets, lifts, electrical and fire systems, paint and signage, under one finishing contract with an itemised BOQ. Indicative rates are PKR 2,300–6,600 per sq ft depending on grade.
Complete Commercial Plaza Design & Construction Solutions
From feasibility to completion certificate, ACCO provides complete commercial plaza design and construction solutions in DHA Lahore: design, drawings, approvals, grey structure, façade, MEP, finishing, interiors and project management from one accountable team.
Our Commercial Plaza Process
Site Visit & Brief
Plot, access, uses and budget.
Feasibility
Bylaws, covered area, parking and return.
Concept & 3D
Layouts and elevation options.
Engineering
Structural, MEP and fire design.
Approvals
Submission and follow-up.
BOQ & Contract
Itemised cost, milestone payments.
Construction
Engineer-supervised, weekly reports.
Handover
Testing, as-builts, completion.
How to Choose a Commercial Plaza Builder in DHA
- Built plazas – visit completed commercial buildings, not just renders.
- In-house disciplines – architects with PEC-registered structural and MEP engineers.
- Feasibility first – a revenue-versus-cost comparison before design is frozen.
- Itemised BOQ – quantities, brands and rates, not a lump sum.
- Fire and life safety – designed from concept, not added later.
- Approvals handled – submission through completion certificate.
- Written contract – programme, milestone payments and warranty.
DHA Lahore
Commercial Design
Frequently Asked Questions
Which is the best construction company for commercial plazas in DHA Lahore?
Choose a design-and-build company that knows DHA approvals and inspections, with built work you can visit, in-house architects and PEC-registered engineers, an itemised BOQ, milestone payments and a written warranty. Ahmed Construction Company (ACCO) has designed and built in Lahore since 1998 and provides commercial plaza construction across DHA Lahore.
Which DHA Lahore phases does ACCO work in?
ACCO provides commercial plaza design and construction in all DHA Lahore phases: Phase 1, 2, 3, 4, 5, 6, 7, 8, 9 (Town), 9 Prism, 10, 11 (Rahbar), 12 (EME) and 13.
What is the commercial plaza construction cost in DHA Lahore?
Indicative 2026-27 Lahore rates are about PKR 3,600 to 4,300 per sq ft for grey structure with basement, PKR 7,500 to 11,000 per sq ft for turnkey commercial plaza construction and PKR 10,000 to 16,000 for premium mixed-use buildings, excluding land, DHA fees and utility connections.
How much does commercial plaza finishing cost per square foot in DHA?
About PKR 2,300 to 3,300 per sq ft for budget plazas, PKR 3,300 to 4,600 for standard commercial and PKR 4,600 to 6,600 for premium glass-facade plazas, added to the grey structure cost.
What approvals are needed for a commercial plaza in DHA Lahore?
DHA-approved drawings are needed before work starts: architectural drawings by a PCATP/DHA-registered architect and structural drawings signed by a PEC-registered engineer, prepared to the DHA Lahore Construction and Development Regulations, followed by stage inspections and a completion certificate. Height on some commercial sites may need DHA Executive Board approval.
Are basements required for commercial plazas in DHA?
Basements are common on DHA commercial plots because parking requirements are calculated by use and often decide the number of basement levels. Requirements depend on plot size, location and use, so ACCO checks them at feasibility stage.
How long does it take to build a commercial plaza in DHA Lahore?
Design and DHA approvals usually take 3 to 6 months. Construction of a 4 to 10-storey plaza typically takes 18 to 30 months depending on basements, facade, lifts and MEP scope.
Does ACCO work as a grey structure contractor for DHA commercial plazas?
Yes. ACCO offers DHA commercial plaza grey structure only, finishing only or full turnkey construction, each with daily engineer supervision and an itemised BOQ.
Are design drawings free with ACCO?
Yes. Architectural, structural and MEP drawings are free when ACCO is awarded the construction. Design-only services are quoted separately after reviewing the plot and brief.
Can ACCO renovate an older commercial plaza in DHA Phase 1 to 5?
Yes. ACCO renovates and remodels older DHA plazas, including facades, lobbies, toilets, lifts, electrical upgrades and fire safety, often while tenants continue trading.
How do I contact ACCO for a DHA commercial plaza?
Call or WhatsApp 0322-8000190, email info@acco.com.pk or visit www.acco.com.pk with your plot size, DHA phase, block and intended uses. ACCO will prepare a feasibility, concept and cost proposal.
Planning a Commercial Plaza in DHA Lahore?
Send your plot size, DHA phase and block, and intended uses. ACCO will check the DHA rules and prepare a feasibility, concept and cost proposal.
Get a Feasibility & EstimateWhatsApp 0322-8000190
Ahmed Construction Company (ACCO) · Office 2, 3rd Floor, Bigcity Plaza, Gulberg-III, Lahore · info@acco.com.pk · www.acco.com.pk
