6 Marla House Construction Cost Lahore Pakistan

Architecture Design and Construction Services Lahore
Total Cost
1.08 Crore
Grey Structure Material Cost
50.26 Lakh
Finishing Material Cost
46 Lakh
Labour Cost
11.36 Lakh
Price Per Sq Ft
4,690

Breakdown of Overall Construction Cost By Percentage (PKR)

 
  • Foundation & Structure52.02 Lakh
  • Plumbing Works7.66 Lakh
  • Electrical Works10 Lakh
  • Wood, Metal and Tile Works33.09 Lakh
  • Fittings & Fixtures4.85 Lakh

Foundation & Structure

Foundation & Structure includes materials for the basic house structure including foundation, floors, walls, roofing, and plastering.

52.02 Lakh

Bricks, Cement, Sand, & Crush

30.38 Lakh
ITEMRATEQUANTITYCOST
Bricks + Rorhi26/Unit637641,657,864
Cement1150/Bag686788,900
Sand87/Cft.3428298,236
Crush150/Cft.1951292,650

Roof Insulation, Termite & Water Proofing

70.09 Thousand
ITEMRATEQUANTITYCOST
Roof Insulation249/Sft.16541,085
Termite Proofing1700/Liter610,200
Water Proofing114/Sft.16518,810

Excavation & Steel Reinforcement

11.65 Lakh
ITEMRATEQUANTITYCOST
Excavation & Backfill + Ghassu25/Cft.4188104,700
Steel Reinforcement265000/Tonne41,060,000

Plumbing Works

Plumbing works include underground piping and drainage systems materials.

7.66 Lakh

Cold and Hot Water Supply

58.53 Thousand
ITEMRATEQUANTITYCOST
25 mm o/d Pipe107/Rft.23024,610
32 mm o/d Pipe175/Rft.9216,100
40 mm o/d Pipe268/Rft.236,164
50 mm o/d Pipe402/Rft.2911,658

Insulation Armaflex

38.63 Thousand
ITEMRATEQUANTITYCOST
32 mm o/d452/Rft.4620,792
50 mm o/d615/Rft.2917,835

Drainage System Piping

1.21 Lakh
ITEMRATEQUANTITYCOST
2″ Dia. Pipe265/Rft.9224,380
3″ Dia. Pipe355/Rft.9232,660
4″ Dia. Pipe467/Rft.13864,446

Gas Piping

74.22 Thousand
ITEMRATEQUANTITYCOST
GI Welded Pipeline 3/4” i/d416/Rft.17271,552
Gas Cock 3/4″ i/d1335/Unit22,670

Pumps and Drains

3.14 Lakh
ITEMRATEQUANTITYCOST
Booster Pump 0.75 HP155000/Unit1155,000
Submersible Water Transfer Pump 1 HP145500/Unit1145,500
Floor Drains1710/Unit813,680

AC Drainage System

17.05 Thousand
ITEMRATEQUANTITYCOST
1″ dia Class “E”110/Rft.15517,050

UPVC Pipeline for Sewerage System

40.7 Thousand
ITEMRATEQUANTITYCOST
6″ dia Class “B”714/Rft.5740,698

Electrical Works

Electrical works include underground wiring and all electrical items.

10.00 Lakh

 
Grey Structure 1.62 Lakh
Finishing 8.38 Lakh

Switches and Back Boxes

1.9 Lakh
ITEMRATEQUANTITYCOST
Power Sockets1475/Socket1217,700
Fan Dimmer1240/Dimmer89,920
Universal Switch Socket625/Socket2415,000
Telephone Sockets (RJ-11)595/Socket21,190
Distribution Board110741/Unit1110,741
TV Sockets495/Socket52,475
Switch Boards1390/Board2433,360

Conduits & Accessories

55.61 Thousand
ITEMRATEQUANTITYCOST
3/4” dia. Electrical PVC Conduit with accessories30/Rft.114834,440
1” dia. Electrical PVC Conduit with accessories31/Rft.34410,664
1.5” dia. Electrical PVC Conduit with accessories41/Rft.401,640
2” dia. Electrical PVC Conduit with accessories50/Rft.462,300
PVC Ceiling Fan Hook547/Unit126,564

Wires & Cables

4.16 Lakh
ITEMRATEQUANTITYCOST
1.5mm Sq. (3/.029) PVC insulated Cu.conductor wire (Light point wiring)4944/Coil1259,328
2.5mm Sq. (7/.029)PVC insulated Cu. conductor wire “Circuit wiring (Normal & UPS) & sockets Split AC7931/Coil1295,172
4mm Sq. PVC insulated Cu. Conductor wire (Power Sockets wiring) Split AC12360/Coil674,160
Four core 16 mm Sq. PVC insulated Cu. conductor cable (From DB-GF to wapda Energy Meter)1494/Rft.70104,580
Cat 5 for Telephone Cable376/Rft.5721,432
TV Coaxial Cable for TV cable357/Rft.17261,404

Lights, Fans and Chandeliers

2.33 Lakh
ITEMRATEQUANTITYCOST
Boundary Wall lights1692/Light23,384
Porch Lights1692/Light46,768
Bedroom Lights1330/Light1215,960
Bathroom Lights1330/Light810,640
Open Area Lights1330/Light1215,960
Kitchen Lights3500/Light828,000
Stair Case Lights1400/Light68,400
Drawing Room Lights3928/Light415,712
Living Area Lights3928/Light831,424
Ceiling Fans8700/Fan869,600
Exhaust Fans4500/Fan627,000

Wood, Metal and Tile Works

Wood, Metal & Tile Works include cabinets, wardrobes, flooring, and all aluminum and iron works.

33.09 Lakh

Paint and Ceiling Works

6.52 Lakh
ITEMRATEQUANTITYCOST
False Ceiling140/Sft.68996,460
Paint57/Sft.9754555,978

Tile Work

12.89 Lakh
ITEMRATEQUANTITYCOST
Floor Tiles310/Sft.2568796,080
Floor Skirting271/Sft.898243,358
Ceramic Tiles on Walls & Dado289/Sft.862249,118

Wooden Doors

4.99 Lakh
ITEMRATEQUANTITYCOST
Main Entrance Door101701/Door1101,701
Room Doors38420/Door4153,680
Washroom and Other Doors27120/Door6162,720
Roof and Terrace Doors27120/Door381,360

Windows

1.76 Lakh
ITEMRATEQUANTITYCOST
Aluminium Room Windows20340/Window6122,040
Aluminium Bathroom Windows13560/Window454,240

Metal Works

2.45 Lakh
ITEMRATEQUANTITYCOST
Staircase and Terrace Railing1605/Rft.68109,140
Main Gate135602/Unit1135,602

Wardrobes & Cabinets

4.48 Lakh
ITEMRATEQUANTITYCOST
Wardrobes77632/Unit3232,896
Kitchen Cabinets107351/Unit2214,702

Fittings & Fixtures

Fittings & Fixtures include kitchen and bath accessories.

4.85 Lakh

Kitchen

56.1 Thousand
ITEMRATEQUANTITYCOST
Kitchen Sink13500/Sink227,000
Sink Mixer11300/Mixer222,600
Gully Trap Chamber3249/Unit26,498

Bathroom

3.86 Lakh
ITEMRATEQUANTITYCOST
Water Closet21696/Unit486,784
Vanity Basin13575/Basin454,300
Basin Mixer12200/Mixer448,800
Muslim Shower2830/Unit411,320
Shower Set36160/Unit4144,640
Toilet Paper Holder1356/Unit45,424
Beveled Edge Mirror7040/Mirror428,160
Soap Dish1083/Dish66,498

Geyser & Manhole

43.39 Thousand
ITEMRATEQUANTITYCOST
Geyser32500/Unit132,500
Manhole5445/Unit210,890

Constructing a 6 Marla house in Lahore involves several factors that contribute to the overall construction cost. Please note that the prices mentioned here are approximate and can vary based on factors such as location, quality of materials, and labor costs. As of my last knowledge update in September 2021, here is a rough breakdown of the construction cost for a 6 Marla house in Lahore:

  1. Land Acquisition: The cost of the land itself can vary significantly depending on the location within Lahore. In popular areas like DHA and Bahria Town, the price of a 6 Marla plot can range from PKR 4 million to PKR 10 million or even more.

  2. Design and Architectural Costs: Hiring an architect to design your house may cost around 6% to 10% of the total construction budget. This includes the design fees and blueprints.

  3. Construction Materials: The cost of construction materials, including bricks, cement, steel, and roofing materials, can vary. As of 2021, you might budget around PKR 2,000 to PKR 2,500 per square foot for basic construction materials.

  4. Labor and Contractor Fees: Labor costs vary based on experience and skill. Skilled labor is essential for quality construction. Contractor fees can also vary, but it’s important to hire a reputable one who can manage the project efficiently.

  5. Government Approvals and Utility Connections: You’ll need to budget for permits and approvals from local authorities. Connecting utilities like electricity, gas, and water to your property will also require some investment.

  6. Interior Finishes: The cost of interior finishes, such as flooring, paint, doors, and windows, depends on your preferences and budget. You can allocate a portion of your budget for these finishes, which can vary widely.

  7. Contingency Budget: It’s wise to set aside a contingency budget of around 10% to 15% of the total construction cost to account for unexpected expenses during the construction process.

  8. Additional Features: If you plan to include additional features like landscaping, a garage, or a basement, these will add to the overall cost.

  9. Project Management and Miscellaneous Costs: Consider costs associated with project management, inspections, and miscellaneous expenses that may arise during construction.

    1. #6MarlaHouse
    2. #ConstructionCosts
    3. #HouseConstruction
    4. #LahoreProperty
    5. #ConstructionEstimates
    6. #HomeBuilding
    7. #RealEstateLahore
    8. #BudgetConstruction
    9. #CostEstimation
    10. #ConstructionMaterials
    11. #BuildingContractors
    12. #HouseDesign
    13. #PropertyDevelopment
    14. #ConstructionTips
    15. #HomeRenovation
    16. #ConstructionBudget
    17. #LahoreConstruction
    18. #InteriorDesign
    19. #ArchitecturalDesign
    20. #ResidentialProperty
Architecture Design and Construction Services Lahore