Help Centre
Frequently Asked Questions About ACCO Construction Services
Ahmed Construction Company (ACCO) provides construction, architectural planning, building design, finishing, and related project services. Planning a construction project involves important decisions about budgets, drawings, materials, contractors, approvals, and timelines.
This page answers common questions about house construction, architectural design, grey structure, turnkey construction, renovation, commercial buildings, and healthcare facilities. If your question is not covered here, contact our team to discuss your project requirements.
01About ACCO and Our Construction Services
What is Ahmed Construction Company (ACCO)?
Ahmed Construction Company (ACCO) is a construction and architectural services company serving clients in Lahore and other locations according to project requirements. Its services include residential construction, architectural design, commercial building construction, finishing, and related construction solutions.
What construction services does ACCO offer?
ACCO’s service portfolio includes house design and construction, grey structure construction, turnkey construction, commercial building projects, renovation, interior finishing, and healthcare facility construction. Confirm the scope and availability of individual services with our team for your specific project.
Where does ACCO provide construction services?
ACCO is based in Lahore, Pakistan, and can discuss projects in Lahore and other locations depending on the project scope, site location, and operational requirements. Contact us to confirm service availability for your area.
How can I contact ACCO for a construction project?
You can contact ACCO by phone at 0311-1749849, email info@acco.com.pk, or through the contact options on our contact page.
How can I request a construction quotation from ACCO?
Share your project location, plot dimensions, approximate covered area, number of floors, required services, preferred material specifications, and available drawings. Our team can review the information and discuss the appropriate next steps for an estimate.
02House Design and Architectural Planning
Does ACCO provide house design services in Lahore?
ACCO offers house design and architectural planning services. The scope may include floor plans, elevations, space planning, and coordination with other design disciplines, depending on the agreed project requirements. Learn more about house design in Lahore.
Can ACCO design a 5 Marla, 10 Marla, or 1 Kanal house?
House design requirements can vary by plot size, dimensions, orientation, family needs, and applicable building regulations. Discuss your plot details and preferred layout with ACCO to determine the appropriate design scope.
What information is required to design a house?
Useful information includes plot dimensions, location, preferred number of floors, family requirements, room preferences, parking needs, budget, and any applicable society regulations. A site survey or additional documents may also be needed.
Does house design include structural drawings?
Structural drawings are a separate technical requirement from architectural layouts. Confirm whether structural engineering and calculations are included in your proposal and ensure that the work is prepared or reviewed by appropriately qualified professionals.
Can I customize my house design?
Yes, design requirements can be discussed according to your lifestyle, space requirements, preferred architectural style, and budget. Final designs must also account for site conditions and applicable regulations.
Why should architectural planning be completed before construction?
Proper planning helps coordinate room layouts, circulation, structural requirements, electrical and plumbing systems, material selections, and construction quantities before work begins. This can reduce avoidable changes during execution.
03House Construction in Lahore
Does ACCO provide complete house construction services?
ACCO offers residential construction solutions, with the exact scope depending on the project agreement. Discuss whether you require grey structure, finishing, or a more comprehensive turnkey package. See house construction in Lahore.
What is the difference between grey structure and turnkey construction?
Grey structure generally covers the principal structural and masonry stages of a building, while turnkey construction typically covers a broader scope that may include finishing and building services. The exact inclusions vary by contractor and contract, so always review the itemized scope.
Does ACCO construct houses in DHA Lahore?
ACCO has a dedicated construction service page for DHA Lahore. Discuss your plot location, proposed work, and applicable DHA requirements with our team before finalizing the project. Learn more: construction company in DHA Lahore.
Can ACCO help with house construction in Bahria Town Lahore?
You can discuss residential construction requirements for Bahria Town Lahore with ACCO. Project feasibility, scope, and compliance requirements should be confirmed for the specific plot and applicable society regulations. See construction in Bahria Town Lahore.
What factors affect the cost of house construction in Lahore?
Construction cost depends on covered area, number of floors, site conditions, structural design, material quality, labour, electrical and plumbing systems, finishing specifications, and the agreed scope of work. A reliable estimate should be based on project-specific quantities and specifications rather than plot size alone.
How is covered area different from plot area?
Plot area is the total land area, whereas covered area refers to the building area measured according to the applicable measurement method. Covered area may differ across floors, and balconies, terraces, basements, or other spaces may be treated differently under specific rules or estimates. Always confirm the measurement basis used in your quotation.
How long does it take to construct a house?
The construction timeline depends on the house size, design complexity, approvals, site conditions, material availability, workforce, weather, and finishing requirements. A realistic schedule should be established after reviewing the project scope.
Can I get an estimate before construction drawings are finalized?
A preliminary estimate may be possible using initial dimensions and an agreed scope. However, the accuracy of the estimate generally improves when architectural drawings, structural information, specifications, and quantities are available. Explore our residential construction services.
04Grey Structure and Turnkey Construction
What work is normally included in a grey structure?
Depending on the contract, grey structure work may include excavation, foundations, structural concrete, reinforcement, masonry, and selected plastering or related works. The exact inclusions must be stated in the BOQ or contract.
Does grey structure construction include tiles and paint?
Tiles, decorative paint, kitchen cabinets, wardrobes, and other finishing items are generally treated as finishing work rather than core grey structure. However, package definitions differ, so confirm the scope before signing.
What is turnkey house construction?
Turnkey construction is a project delivery arrangement in which the contractor undertakes an agreed, broader package of construction and finishing work. It may include building services and selected fixtures, but the contract must specify what is included and excluded. See turnkey construction in Lahore.
Which is better: grey structure or turnkey construction?
Grey structure may suit owners who want to manage finishing separately or complete the project in stages. Turnkey construction may suit owners who prefer coordinated delivery under a broader contract. The right choice depends on your budget, availability to manage the project, desired control, and contractor agreement.
How can I compare two construction quotations?
Compare the scope of work, covered-area calculations, material brands and grades, quantities, labour, exclusions, payment milestones, project duration, variation procedure, and taxes or other charges. A lower headline rate does not necessarily represent the lower total project cost.
05House Construction Costs and Estimates
What is the current house construction rate per square foot in Lahore?
There is no single rate that applies to every house. Pricing changes with material specifications, labour costs, covered area, structural requirements, building services, finishing quality, and the date of estimation. Request a current, project-specific quotation from ACCO.
Does a construction estimate include materials and labour?
That depends on the package. Some estimates include both materials and labour, while others may cover selected work only. Ask for a written breakdown of materials, labour, installation, exclusions, and provisional amounts.
What is a BOQ in construction?
A Bill of Quantities (BOQ) is a structured document listing construction work items, their quantities, units, and applicable rates or amounts. It helps the client understand the estimated cost and compare proposals on a consistent basis.
Why can the final construction cost differ from the initial estimate?
Costs may change when the design is revised, specifications are upgraded, concealed defects are discovered, quantities change, or additional work is requested. A clear variation procedure helps document the reason and financial impact of each change.
Should I keep a contingency budget?
A contingency allowance can help cover unforeseen site conditions or approved changes. The appropriate amount depends on the project and its level of design and cost certainty; it should be discussed with the project team rather than treated as a guaranteed fixed percentage.
06Renovation and Interior Finishing
Does ACCO provide house renovation services?
ACCO offers construction-related renovation and finishing solutions. Confirm the availability and scope of your specific requirements, such as repairs, interior upgrades, flooring, painting, or kitchen and bathroom improvements. See interior design services.
Can an existing house be renovated without demolishing the entire building?
Many renovation projects can focus on selected areas. However, the appropriate approach depends on the property’s condition, structural integrity, concealed services, and the extent of the proposed changes. A site assessment is advisable before deciding.
What is included in house finishing?
Finishing may include flooring, tiles, painting, ceilings, doors, lighting, sanitary fixtures, kitchen cabinets, wardrobes, and other interior elements. The included items should be listed clearly in the quotation.
Can I renovate my kitchen or bathroom separately?
Yes, a renovation can be limited to a kitchen, bathroom, or another part of the house. The scope should account for any necessary plumbing, electrical work, waterproofing, ventilation, demolition, and disposal.
Do structural alterations require professional assessment?
Yes. Removing walls, modifying slabs, extending floors, or changing load-bearing elements requires appropriate technical assessment. Relevant approvals should also be confirmed before work begins.
07Commercial Building and Plaza Construction
Does ACCO provide commercial building construction services?
ACCO offers commercial construction services. Contact the team with your proposed location, plot dimensions, building use, floor requirements, and desired construction scope to discuss project feasibility. Learn more: commercial construction.
Can ACCO help design and construct a commercial plaza?
You can discuss commercial plaza planning and construction with ACCO. The required services depend on the project, including architectural planning, structural design, building services, cost estimation, and construction execution. See commercial plaza construction.
What affects the cost of a commercial plaza?
Important factors include plot dimensions, permitted building area, number of floors, structural system, basement and parking requirements, lifts, fire and life-safety provisions, MEP systems, façade, finishing, and approval requirements.
What should be checked before constructing a commercial plaza?
Review land use, plot dimensions, permissible covered area, setbacks, height restrictions, parking, access, fire and life-safety provisions, building services, and applicable authority requirements. These must be confirmed for the particular property and current regulations.
08Hospital and Healthcare Facility Construction
Does ACCO provide hospital design and construction services?
ACCO has a healthcare and hospital construction service offering. The scope of a particular project should be confirmed with the team, including architectural planning, departmental layouts, engineering coordination, interiors, and construction work where applicable. See hospital design and construction.
What is important when planning a hospital building?
Hospital planning must consider patient and staff circulation, departmental zoning, infection prevention, accessibility, emergency access, medical equipment, electrical resilience, ventilation, plumbing, fire safety, and applicable healthcare and building requirements.
Can hospital design include medical equipment planning?
Medical equipment planning may be coordinated with architectural layouts and building services. Requirements depend on the facility type, clinical departments, equipment specifications, and input from relevant healthcare professionals.
Are hospital construction requirements different from ordinary residential construction?
Yes. Healthcare facilities have specialized functional, engineering, safety, and operational requirements. The project team must identify applicable building regulations, healthcare requirements, and specialist design needs before finalizing the plans.
09Project Management, Quality and Agreements
How can I monitor construction progress?
Progress can be tracked through an agreed schedule, site inspections, documented progress updates, quantity checks, and milestone reviews. The reporting process should be defined in the project agreement.
How should material quality be checked?
Specify materials by brand, grade, standard, or performance requirement where applicable. Verify deliveries against approved specifications and arrange appropriate inspections or tests for critical materials and work stages.
Should I sign a written construction agreement?
Yes. A written agreement should identify the scope, specifications, price basis, payment milestones, timeline, exclusions, variation procedure, responsibilities, and process for resolving defects or disputes.
Are construction approvals included in the contractor’s service?
This depends on the agreed scope and the requirements of the relevant authority or housing society. Confirm who prepares submissions, who manages applications, which fees are excluded, and who is responsible for obtaining the required approvals.
Does ACCO provide a warranty for construction work?
Any warranty or defects-liability arrangement should be confirmed in writing for the specific project. Review its duration, coverage, exclusions, and procedure for reporting defects before entering into a contract.
10How to Start Your Project with ACCO
What should I prepare before contacting ACCO?
Where available, prepare:
- Project location and plot dimensions
- Plot possession or relevant property information
- Required covered area and number of floors
- Architectural drawings or initial design ideas
- Required services, such as grey structure or turnkey construction
- Preferred material and finishing standards
- Budget range and expected timeline
- Any relevant society or authority documentation
You can still contact ACCO if some details are not available yet.
Can ACCO prepare a project estimate using my drawings?
Drawings can help establish quantities, specifications, and scope. The accuracy of an estimate depends on the completeness of the drawings and technical information, as well as the clarity of the requested work.
How do I arrange an initial project discussion?
Contact ACCO by phone at 0311-1749849 or email info@acco.com.pk. Share your basic project details and request guidance on the next steps.
Contact Ahmed Construction Company (ACCO)
Planning to build, renovate, or develop a property? Contact ACCO to discuss your project requirements and determine the appropriate scope for an initial estimate.
Phone: 0311-1749849 · Email: info@acco.com.pk