Quick contact info

Welcome to Ahmed Construction Company – your partner for innovative and high-quality construction. From residential to commercial projects, we turn dreams into reality with precision and reliability. Building a future of excellence, one project at a time.

icon_widget_image Monday-Friday: 9am to 5pm; Satuday: 10am to 2pm icon_widget_image Office 2, 3rd Floor, Bigcity Plaza, icon_widget_image + (92) 322-800-0190 + (923) 111-749-849 icon_widget_image info@acco.com.pk ahmed@acco.com.pk

Hospital Turnkey Solutions in Pakistan | Complete Design & Build Services

Healthcare Architecture

Hospital Turnkey Solutions in Pakistan | Complete Design & Build Services by ACCO

Meta Title: Hospital Turnkey Solutions in Pakistan | Complete Design & Build by ACCO
Meta Description: ACCO offers complete hospital turnkey solutions in Pakistan, including design, construction, and medical equipment installation. Delivering fully operational healthcare facilities with excellence.


Hospital Turnkey Solutions in Pakistan | ACCO Healthcare Specialists

At ACCO Construction, we provide end-to-end hospital turnkey solutions in Pakistan β€” from initial concept design to full hospital commissioning. Our team of healthcare architects, engineers, and project managers ensures that your hospital project is delivered on time, within budget, and ready for immediate operations.

Whether you’re developing a 50-bed hospital, a 100-bed multi-specialty facility, or a 300-bed tertiary care center, ACCO is your trusted partner for complete hospital design and build services.

πŸ”— Learn more about ACCO’s Hospital Construction Services


What’s Included in Our Turnkey Hospital Services?

πŸ₯ Comprehensive Planning & Feasibility

  • Site selection support

  • Financial feasibility studies

  • Healthcare facility master planning

✏️ Architectural & Engineering Design

  • Healthcare architectural concepts

  • Structural, civil, MEP (Mechanical, Electrical, Plumbing) designs

  • Space planning for optimal workflow and patient care

πŸ—οΈ Hospital Construction & Project Management

  • Ground-up hospital construction

  • Quality control, health, and safety compliance

  • Timely project scheduling and budget management

βš™οΈ Medical Equipment Planning & Installation

  • Equipment layout and hospital fit-out

  • Procurement and installation of diagnostic, surgical, and patient care equipment

  • Integration of medical technologies

πŸ₯ Hospital Commissioning

  • System testing and validation

  • Handover of fully operational healthcare facilities

  • Staff training for equipment and systems

πŸ”— Explore our Healthcare Facility Design Expertise


Types of Healthcare Facilities We Deliver

  • General Hospitals

  • Specialty Centers (Cardiology, Oncology, Orthopedics)

  • Diagnostic & Imaging Centers

  • Maternity and Child Care Hospitals

  • Medical Colleges and Training Facilities

  • Pharmaceutical Plants and Laboratories

πŸ”— See our Hospital Design and Planning Services


Why Choose ACCO for Your Hospital Turnkey Project?

βœ… One Contract, Full Responsibility β€” We handle everything from site development to hospital handover.
βœ… Healthcare Sector Expertise β€” Over 20 years designing and building healthcare facilities.
βœ… Regulatory Compliance β€” We meet WHO standards, JCI guidelines, and Pakistan health regulations.
βœ… Sustainability & Efficiency β€” Smart designs that reduce operational costs and improve patient experiences.
βœ… Proven Track Record β€” Delivered successful projects across Pakistan, including 50-bed, 100-bed, and 300-bed hospitals.

πŸ”— View our Completed Healthcare Projects


Cost of Turnkey Hospital Projects in Pakistan

The estimated cost of hospital turnkey projects depends on various factors including:

  • Location and land acquisition

  • Facility size and number of beds

  • Complexity of medical specialties

  • Level of medical equipment and technology integration

  • Design sophistication (basic vs luxury hospitals)

Typical starting construction cost:

  • 50-Bed Hospital: PKR 400M–600M

  • 100-Bed Hospital: PKR 700M–1.2B

  • 300-Bed Tertiary Care Center: PKR 2.5B–3.5B

πŸ”— Read: 100-Bed Hospital Construction Feasibility in Pakistan

(Prices may vary; detailed project feasibility studies are recommended.)


Our Process – How We Deliver Hospital Turnkey Projects

  1. Requirement Analysis & Site Study

  2. Concept Design and Feasibility Approval

  3. Architectural, Structural & MEP Detailed Design

  4. Medical Equipment Planning & Procurement

  5. Hospital Construction & Interior Fit-Out

  6. Installation, Testing & Commissioning

  7. Handover of a Fully Operational Healthcare Facility

πŸ”— Request a Consultation for Your Hospital Project


Let’s Build Healthcare for a Better Future

At ACCO, we believe that every community deserves access to quality healthcare infrastructure.
Partner with us to create modern hospitals in Pakistan β€” facilities that are efficient, patient-centered, and future-ready.

πŸ“ž Call Now: +92 322 8000190
πŸ“§ Email: info@acco.com.pk
🌐 Website: www.acco.com.pk

ACCO Construction β€” Your Trusted Partner for Complete Hospital Turnkey Solutions in Pakistan. πŸ₯✨

πŸ—“οΈ Hospital Project Execution Timeline (Sample Gantt Chart Plan)

Here’s a basic timeline for a 100-Bed Hospital Turnkey Project β€” you can adjust days based on project size:

Phase Activities Duration Start – End
1. Project Initiation Feasibility Study, Land Acquisition, Initial Planning 30 Days Day 1 – Day 30
2. Concept Design & Approvals Master Plan, Schematic Designs, Regulatory Approvals 45 Days Day 31 – Day 75
3. Detailed Design Development Architectural, Structural, MEP, Interior Design 60 Days Day 76 – Day 135
4. Tendering & Procurement Contractor Selection, Medical Equipment Procurement 45 Days Day 136 – Day 180
5. Site Preparation Land Clearing, Grading, Site Utilities 30 Days Day 181 – Day 210
6. Main Construction Works Grey Structure, Civil Works, External Works 180 Days Day 211 – Day 390
7. MEP Installations Mechanical, Electrical, Plumbing Systems Installation 120 Days Day 301 – Day 420
8. Interior Works & Finishing Flooring, Ceiling, Painting, Signage 90 Days Day 391 – Day 480
9. Medical Equipment Installation Delivery, Testing, Commissioning 60 Days Day 451 – Day 510
10. Testing, Commissioning & Handover Systems Testing, Staff Training, Handover 45 Days Day 511 – Day 555

Total Estimated Duration: 18–20 Months
(You can create a Gantt Chart easily in Excel or MS Project using these phases.)


πŸ“Š Financial Feasibility Template for Hospital Turnkey Projects

Here’s a simple layout for you to use in proposals or client discussions:


πŸ“‹ Capital Cost Estimate:

Item Estimated Cost (PKR)
Land Acquisition 50M–150M
Architectural & Engineering Design 4%–6% of construction cost
Civil & Structural Construction 2,000–2,800 per sqft
MEP Works (Electrical, HVAC, Plumbing) 800–1,200 per sqft
Interior Finishing & Fit-Out 1,000–1,400 per sqft
Medical Equipment Procurement 200M–400M (varies widely)
Furniture & Fixtures (FF&E) 80M–150M
Project Management & Supervision 5%–7% of construction cost
Permits & Regulatory Approvals 5M–10M
Contingencies 8%–10% of total cost
Total Project Cost Estimate 700M–1.2B PKR (100-Bed)

πŸ“ˆ Operating Cost Estimate (Annual):

Item Estimated Cost (PKR)
Salaries & Staff Wages 120M–200M
Utility Costs (Electricity, Gas, Water) 20M–40M
Maintenance & Facility Management 10M–15M
Consumables (Medical & Non-Medical) 30M–50M
Insurance Premiums 5M–10M
Marketing & Administration 10M–15M
Total Annual Opex 195M–330M PKR

πŸ“‘ Suggested Attachments to Make Proposals Look Premium:

  • πŸ“„ Gantt Chart for Project Execution

  • πŸ“„ Cost Breakdown Tables

  • πŸ“„ Sample Hospital Master Plan / Floor Layout

  • πŸ“„ Sustainability Report (LEED Certification if applicable)

  • πŸ“„ Risk Management Plan


Would you like me to also prepare:

  • A professional PowerPoint proposal template for hospital clients?

  • OR a sample hospital master plan layout you can use and customize?

(Just tell me! πŸš€ It’ll make your hospital project presentations super impressive.)
Would you like both or one of them? 🎯