Quick contact info

Welcome to Ahmed Construction Company – your partner for innovative and high-quality construction. From residential to commercial projects, we turn dreams into reality with precision and reliability. Building a future of excellence, one project at a time.

icon_widget_image Monday-Friday: 9am to 5pm; Satuday: 10am to 2pm icon_widget_image Office 2, 3rd Floor, Bigcity Plaza, icon_widget_image + (92) 322-800-0190 + (923) 111-749-849 icon_widget_image info@acco.com.pk ahmed@acco.com.pk

Architecture and Construction Company

Hospital interior design finishing works Pakistan

Hospital Interior Design & Finishing Works | ACCO

Hospital interiors are not decorative — they are clinical infrastructure. Every flooring choice, wall finish, ceiling detail, and colour scheme affects infection control, patient recovery, staff wellbeing, and long-term maintenance cost. Great hospital interior design is invisible when it works: antimicrobial, seamless, calming, and durable for 15–20 years.

At Ahmed Construction Company (ACCO), our interior and finishing division specialises in healthcare-grade fit-out across OT, ICU, wards, OPD, and public spaces.

🎨 Principles of Hospital Interior Design

  • Antimicrobial Materials: Every surface resists biofilm and cleans easily.
  • Seamless Junctions: Coved skirting, sheet flooring — no dirt traps.
  • Evidence-Based Colour: Reduce anxiety, support wayfinding.
  • Daylight & Views: Improve recovery and staff wellbeing.
  • Noise Control: Absorbent ceilings, resilient flooring.
  • Durability: High-traffic finishes rated for 15–20 year life.
  • Cost of Ownership: Lifecycle cost trumps first cost.

🧱 Hospital Flooring by Zone

ZoneRecommended FlooringRate (PKR/sq ft)
OT / ICU / NICUAntibacterial homogeneous vinyl (welded seams)1,200–2,000
OT Sterile CoreEpoxy self-levelling, coved to walls800–1,500
Wards / CabinsVinyl sheet or LVT900–1,600
OPD / WaitingPorcelain tile or vinyl550–1,100
CorridorsHomogeneous vinyl or porcelain700–1,300
RadiologyAnti-static vinyl1,000–1,700
Kitchen / Wet AreasAnti-slip porcelain500–1,000

🧱 Walls, Ceilings & Doors

  • OT Walls: Modular antibacterial panels (SS/GRP) with gasket-sealed joints.
  • ICU / NICU Walls: Washable epoxy paint or PVC wall cladding.
  • Ward Walls: Emulsion paint with washable finish + wall guards.
  • Ceilings: Gypsum with washable paint in wards; sealed metal tile in OT/ICU; acoustic tile in offices.
  • Doors: Laminate or steel doors with antimicrobial hardware; auto-sliding for OT/ICU.
  • Corner Guards: Stainless steel or PVC at all corridor corners and doorframes.

🎨 Colour Psychology by Department

  • OPD / Reception: Warm neutrals, welcoming blues.
  • Paediatric: Bright primary colours, playful graphics.
  • Maternity: Soft pastels, warm lighting.
  • Oncology / Chemo: Muted greens, biophilic wood tones.
  • Cardiac: Calming blues, soft transitions.
  • OT / ICU: Sterile whites with green accents for eye rest.

💡 Hospital Lighting Design

  • OT surgical lights: 160,000–200,000 lux, CRI > 95.
  • ICU: adjustable examination + ambient + patient reading.
  • Wards: general + reading + night light.
  • Corridors: 100–300 lux, uniform, no glare.
  • Circadian tuning in ICU for patient rest cycle.

⚖️ Vinyl vs Epoxy vs Tile — Comparison

PropertyVinylEpoxyPorcelain
Best ForOT, ICU, wardsOT sterile corePublic / wet
SterilityExcellentExcellentModerate
Life15–20 years10–15 years20+ years
Cost (PKR/sq ft)900–2,000700–1,500500–1,100

🏨 ACCO Interior Portfolio

  • LDMC — Modular OT panels + epoxy + vinyl.
  • MCH Islamkot — Antibacterial vinyl + wayfinding.
  • Multiple private hospitals — turnkey fit-out.

Related: Hospital Finishing Works.

❓ FAQ

What flooring is best for a hospital?

Homogeneous antibacterial vinyl with welded seams for wards, ICU, and general zones; epoxy self-levelling for OT sterile core; porcelain tile for wet and public areas.

How long does hospital interior fit-out take?

4–8 months for a 50-bed hospital; 8–14 months for a 150-bed facility.

Do you supply hospital furniture?

Yes. ACCO can procure all clinical and admin furniture under turnkey scope.

Can you renovate an operational hospital?

Yes. Phased renovation with infection-control barriers.

📞 Talk to ACCO

Ahmed Construction Company (ACCO)
Office 2, 3rd Floor, Bigcity Plaza, Gulberg-III, Lahore
📞 0322-8000190  |  ✉️ info@acco.com.pk