contact
service

February 2021 Market Latest Construction Rates. Dream House Construction in Pakistan!

Dream House Construction in Pakistan!

 September 26, 2021 By Mohsin Munir  In House construction guide  14 Comments

Constructing your dream house has been a nightmare in Pakistan. A house which everyone dreams of, majority can turn the dream into a reality only once in their lifetime. A dream turns into a nightmare when one gets into the hands of unskilled and non-technical labor resulting in form of financial loss and above all mental stress. Nobody else is to be blamed in this situation, rather the one him/herself, whose lack of knowledge and fine research brings him/her to this stage. As its said “Its never too late”, indeed it is! But to revert the mistakes and wrong doings, extra cost will have to be sustained hence causing the financial loss. Moreover extra time will be spent resulting in time-loss too. Team Overc’s is bringing a series of construction guides to educate viewers about the process of constructing dream house in Pakistan

In a market like Pakistan, 80% of the construction industry is in the grip of un-professional and non-technical contractors. The general public also prefers this contractor system due to budget constraints and cost savings. In this system, the construction of house starts without defining any roadmap and the owner or client is provided with literally no idea about the approximate end cost. Secondly, workmanship plays an important role in the construction of the house, workmanship comes with teamwork. In contractor system there is no team available to supervise the project at any stage, hence all the burden of supervision rests on the shoulders of the client or owner himself.

Let's have a brief look at other factors that make house construction a nightmare:

  • Insufficiency of fine research before starting the proceedings
  • Starting the work without making a proper roadmap.
  • Compromising on quality of material for saving the costs
  • Compromising on the quality of labor and contractors for saving the costs
  • Lack of self-supervision
  • Unprofessional teamwork and workmanship
  • Inappropriate behaviors with labor and contractors
  • Financial constraints
  • Improper paperwork and agreements
  • Lack of technical knowledge

 

Share this post:

0 Comments

Leave us a Comment

About us

We believe that its very light version & Simple, Creative & Flexible Design with Standards

Main Office
Office 24, 2nd Floor, Bigcity Plaza,
Gulberg-III, Lahore
DHA Office
Ground Floor, Plaza B/148, Broadway
Commerial Phase, DHA Lahore
Phone: +(92) 322 8000 190
Office: +(92) 423 577 4098
Email: info@acco.com.pk

Working Hours

Our support team available to help you 24/7 a day

  1. Monday-Saturday: 9am to 6pm
  2. Sunday: Closed
  3. Help Desk: Open 24/7