1 Kanal House Grey Construction Updated Cost in Lahore Pakistan 2024

1 Kanal House Grey Structure Cost in Lahore Pakistan

Discover the latest cost estimates for constructing a 5 Marla House Grey Structure Cost in Lahore Pakistan. Stay informed about the updated expenses involved in the essential groundwork, framework, and initial construction phases. Plan your budget effectively with accurate insights into the current market rates for building your dream home in Lahore’s vibrant real estate landscape.

Main TopicsSubtopics
1. Introduction to Grey Structure Construction1.1 Definition of Grey Structure
1.2 Importance in Overall Construction Process
1.3 Scope of Work in Grey Structure
2. Overview of 1 Kanal House Dimensions2.1 Standard Plot Size and Dimensions
2.2 Space Allocation for Grey Structure
2.3 Floor Area Considerations
3. Components of Grey Structure Construction3.1 Foundation and Footings
3.2 Brickwork and Blockwork
3.3 Roofing and Slabs
3.4 Plastering and Screeding
4. Key Materials Used in Grey Structure Construction4.1 Cement and Sand
4.2 Steel and Rebar
4.3 Bricks and Blocks
4.4 Aggregates and Concrete
5. Labor Costs for Grey Structure Construction5.1 Skilled Labor (Masons, Steel Fixers, etc.)
5.2 Unskilled Labor
5.3 Contractor Fees
5.4 Labor Market Trends in 2024
6. Estimated Cost Breakdown for Grey Structure (2024)6.1 Cost of Materials
6.2 Labor Costs
6.3 Equipment and Machinery Costs
6.4 Miscellaneous Costs
7. Cement and Concrete Costs in 20247.1 Cement Prices per Bag
7.2 Concrete Mix Ratios and Costs
7.3 Ready-Mix Concrete Options
7.4 Factors Affecting Costs
8. Steel and Rebar Costs in 20248.1 Current Prices per Ton
8.2 Steel Grades and Their Impact on Cost
8.3 Steel Reinforcement for Beams and Columns
9. Brick and Block Costs in 20249.1 Cost per 1000 Bricks
9.2 Comparison of Brick vs. Block Costs
9.3 Quality Considerations for Bricks and Blocks
10. Excavation and Foundation Costs10.1 Excavation Cost per Cubic Foot
10.2 Cost of Footings and Foundations
10.3 Waterproofing and Insulation Costs
11. Roofing and Slab Construction Costs11.1 Roofing Material Costs
11.2 RCC Slab Construction Costs
11.3 Waterproofing and Insulation Costs
12. Wall Construction Costs12.1 Brickwork and Blockwork Costs
12.2 Internal and External Wall Costs
12.3 Load-Bearing vs. Non-Load-Bearing Walls
13. Plastering and Screeding Costs13.1 Internal Wall Plastering Costs
13.2 External Wall Plastering Costs
13.3 Screeding Costs for Floors
14. Cost of Utilities in Grey Structure14.1 Electrical Conduit and Wiring Costs
14.2 Plumbing Piping Costs
14.3 HVAC Ducting Costs
15. Factors Influencing Cost Variations in 202415.1 Inflation and Economic Conditions
15.2 Material Supply Chain Issues
15.3 Government Regulations and Taxes
16. FAQs about Grey Structure Construction Costs in Lahore (2024)16.1 What is included in the grey structure of a 1 Kanal house?
16.2 How much does it cost per square foot to build a grey structure in 2024?
16.3 What are the major cost drivers for grey structure construction?
16.4 How long does it take to complete the grey structure?
16.5 How can I reduce costs without compromising quality?
16.6 Is it better to use bricks or blocks for the grey structure?

1 Kanal House Grey Structure Construction Cost in Lahore, Pakistan (2024)

1. Introduction to Grey Structure Construction

In the context of building a house in Pakistan, particularly a 1 Kanal house in Lahore, the term “grey structure” refers to the basic framework of the building. This phase includes the construction of the foundation, walls, roof, and other structural elements but does not cover the finishing work such as painting, tiling, or electrical fittings. The grey structure is crucial as it forms the skeleton of the house, upon which all other construction activities are based.

The grey structure is typically completed first, providing the necessary stability and durability to support the entire building. It is a significant portion of the overall construction process, both in terms of time and cost, often accounting for around 50-60% of the total construction budget.

2. Overview of 1 Kanal House Dimensions

A 1 Kanal plot in Lahore typically measures approximately 20 marlas, which is equivalent to 500 square yards or 4500 square feet. The size allows for the construction of a spacious home with multiple rooms, ample outdoor space, and additional features like basements or terraces.

During the grey structure phase, the space is allocated according to the architectural plan, including foundations, walls, and roofing. The design usually includes a ground floor, first floor, and sometimes a basement, depending on the client’s requirements. The plot’s size and the architectural layout play a significant role in determining the cost of the grey structure.

3. Components of Grey Structure Construction

Building the grey structure of a 1 Kanal house involves several critical components:

  • Foundation and Footings: The foundation is the base of the house, supporting the entire structure. This includes excavation, laying footings, and constructing the base slab. The depth and width of the foundation depend on soil conditions and the building’s design.

  • Brickwork and Blockwork: The walls of the house are constructed using bricks or blocks, forming the main structure. This stage includes the construction of internal and external walls, which define the layout of the house.

  • Roofing and Slabs: The roof is constructed using reinforced concrete slabs (RCC), providing the necessary strength and durability to support the structure. This stage also includes any additional slabs for terraces or balconies.

  • Plastering and Screeding: Once the walls and roof are in place, plastering is done to smooth the walls, and screeding is applied to level the floors. This stage prepares the structure for the finishing work that will follow.

4. Key Materials Used in Grey Structure Construction

The cost of building a grey structure is heavily influenced by the materials used, which must be chosen carefully to ensure quality and durability.

  • Cement and Sand: Cement is a primary component in concrete and mortar, used extensively in the foundation, brickwork, and plastering. Sand is mixed with cement to create mortar for bricklaying and plastering.

  • Steel and Rebar: Steel reinforcement bars (rebar) are essential for providing tensile strength to concrete structures, especially in foundations, beams, and slabs.

  • Bricks and Blocks: The choice between bricks and blocks affects both the cost and quality of the construction. Bricks are traditional and widely used, while blocks are larger and can be more cost-effective.

  • Aggregates and Concrete: Aggregates like crushed stone or gravel are mixed with cement and sand to create concrete, used in foundations, slabs, and structural columns.

5. Labor Costs for Grey Structure Construction

Labor costs are a significant part of the overall grey structure budget, influenced by the availability of skilled workers and the complexity of the project.

  • Skilled Labor (Masons, Steel Fixers, etc.): Skilled labor is required for tasks such as masonry, steel fixing, and concrete work. These workers command higher wages due to their expertise and the critical nature of their work.

  • Unskilled Labor: Unskilled labor is used for general construction tasks like material handling, site cleaning, and assisting skilled workers. While their wages are lower, they are essential for the smooth execution of the project.

  • Contractor Fees: Many homeowners opt to hire a contractor to oversee the construction process. The contractor’s fee typically includes a percentage of the total construction cost, covering project management, labor coordination, and quality control.

  • Labor Market Trends in 2024: In 2024, labor costs are expected to rise due to inflation and increased demand in the construction industry. A shortage of skilled workers may also drive up wages, impacting the overall cost of the project.

6. Estimated Cost Breakdown for Grey Structure (2024)

The total cost of constructing the grey structure of a 1 Kanal house in Lahore can vary based on material prices, labor costs, and other factors. Here is an estimated cost breakdown:

  • Cost of Materials: Materials typically account for 60-70% of the total grey structure cost. This includes cement, steel, bricks, and aggregates.

  • Labor Costs: Labor accounts for 30-40% of the cost, depending on the complexity of the design and the rates in the local market.

  • Equipment and Machinery Costs: Equipment such as concrete mixers, scaffolding, and cranes are necessary for construction. These costs are often included in the contractor’s fees or charged separately.

  • Miscellaneous Costs: These include transportation of materials, site security, and waste management

Total Cost

Rs. 1.71 Crore

Grey Structure Material Cost

Rs. 1.41 Crore

Labour Cost

Rs. 30.30 Lakh

Price Per Sq Ft

Rs. 2712

Foundation & Structure

Foundation & Structure includes materials for the basic house structure including foundation, floors, walls, roofing, and plastering.

Rs. 1.52 Crore

Bricks, Cement, Sand, & Crush
Rs. 96.39 Lakh
Excavation & Steel Reinforcement
Rs. 1.90 Lakh
Roof Insulation, Termite & Water Proofing
Rs. 28.44 Lakh
Labor Cost
Rs. 25.52 Lakh

Plumbing Works

Plumbing works include underground piping and drainage systems materials.

Rs. 14.63 Lakh

Cold and Hot Water Supply
Rs. 1.60 Lakh
Insulation Armaflex
Rs. 1.06 Lakh
Drainage System Piping
Rs. 2.18 Lakh
Gas Piping
Rs. 2.05 Lakh
Pumps and Drains
Rs. 3.38 Lakh
AC Drainage System
Rs. 46.75 Thousand
UPVC Pipeline for Sewerage System
Rs. 1.13 Lakh
Labor Cost
Rs. 2.77 Lakh

Electrical Works

Electrical works include underground wiring and all electrical items.

Rs. 3.96 Lakh

Switches and Back Boxes
Rs. 50.04 Thousand
Conduits & Accessories
Rs. 1.45 Lakh
Labor Cost
Rs. 2.02 Lakh

You can get a detailed rates by connecting us here

GET FREE QUOTE

Send us a query to get free estimation of your project. Our team of professionals will happy to assist you.